共 50 条
- [21] Test head scheduling in a semiconductor test facility TWENTY THIRD IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 1998, : 131 - 135
- [22] Design and Validation of a Simulation-based Modular Planning and Scheduling System of Semiconductor Fabrication Facilities MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, PTS 1 AND 2, 2011, 48-49 : 378 - 381
- [23] A Component Based Reconfigurable Scheduling System for Semiconductor Manufacturing MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 1644 - 1647
- [24] HEURISTIC BASED SCHEDULING SYSTEM FOR DIFFUSION IN SEMICONDUCTOR MANUFACTURING PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 1644 - +
- [25] Simulation based real-time scheduling method for dispatching and rework control of semiconductor manufacturing system 2007 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-8, 2007, : 1106 - 1110
- [27] Ant Colony Optimization Based Scheduling for a Semiconductor Wafer Fabrication Facility with Bottleneck Stations 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 520 - 525
- [28] Simulation-based scheduling: Meeting the semiconductor wafer fabrication challenge IIE SOLUTIONS, 1996, 28 (05): : 30 - 34
- [29] Simulation of test wafer consumption in a semiconductor facility ASMC 98 PROCEEDINGS - 1998 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP: THEME - SEMICONDUCTOR MANUFACTURING: MEETING THE CHALLENGES OF THE GLOBAL MARKETPLACE, 1998, : 298 - 302
- [30] THE USERS ROLE IN A SIMULATION BASED SCHEDULING SYSTEM 1989 WINTER SIMULATION CONFERENCE PROCEEDINGS, 1989, : 936 - 941