Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer

被引:4
|
作者
Zou, Haobo [1 ]
Zhou, Guohua [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Econ & Management, Chengdu, Peoples R China
来源
JOURNAL OF INTERNET TECHNOLOGY | 2021年 / 22卷 / 01期
关键词
Repetitive project; Resource transfer; Time cost trade-off; Flexible resource constraint; NSGA-; II; PROJECT SCHEDULING PROBLEM; OPTIMIZATION;
D O I
10.3966/160792642021012201019
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the acceleration of global infrastructure construction in recent years, numerous repetitive construction projects are under planning or construction. Resources need to be transferred between units in the construction process. This transfer will lead to a large amount of time and cost consumption, and the existing research on discrete time-cost trade-off problem (DTCTP) of repetitive projects has paid little attention to this issue. This paper introduces an improved resource transfer scheme (DTCTP-rt) considering calculable resource transfer costs, and the calculation results show that this method can obtain a more practical solution. After introducing resource transfer, resource demands conflicts between units become more intense. In order to address this problem, the concept of flexible resource constraint (FRC) is introduced to form FRCDTCTP-rt. The resource constraint is no longer regarded as a fixed constant, but allowed to float arbitrarily in an interval. The calculation results show that considering FRC provides managers with more and better feasible choices.
引用
收藏
页码:197 / 207
页数:11
相关论文
共 50 条
  • [31] Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
  • [32] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [33] Communication-Computation Trade-off in Resource-Constrained Edge Inference
    Shao, Jiawei
    Zhang, Jun
    IEEE COMMUNICATIONS MAGAZINE, 2020, 58 (12) : 20 - 26
  • [34] The trade-off between stability and makespan in resource-constrained project scheduling
    Van De Vonder, S
    Demeulemeester, E
    Herroelen, W
    Leus, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (02) : 215 - 236
  • [35] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [36] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [37] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [38] GA Optimization Model for Time/cost Trade-off Problem in Repetitive Projects Considering Resource Continuity
    Zhang, Li-hui
    Zou, Xin
    Su, Zhi-xiong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 611 - 617
  • [39] TIME-COST TRADE-OFF ANALYSIS IN SOME CONSTRAINED ASSIGNMENT PROBLEMS
    GEETHA, S
    VARTAK, MN
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (01) : 97 - 101
  • [40] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231