共 50 条
- [24] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects KSCE Journal of Civil Engineering, 2019, 23 : 3265 - 3274
- [27] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619