Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search

被引:82
|
作者
Geem, Zong Woo [1 ]
机构
[1] Johns Hopkins Univ, Environm Planning & Management Program, Clarksburg, MD 20871 USA
关键词
Project scheduling; Critical path method; Time-cost trade-off problem; Combinatorial optimization; Harmony search; ALGORITHM; DESIGN; NETWORKS;
D O I
10.1061/(ASCE)CO.1943-7862.0000167
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Completing a project with minimal time as well as minimal cost is a critical factor for scheduling a project. However, because completion speed tends to be correlated with cost (e.g., usually, time can be saved if more workers are hired), the relationship between time and cost is a trade-off. This study employed a phenomenon-mimicking algorithm, harmony search to perform this biobjective trade-off. The harmony search algorithm was applied to two test examples, and good Pareto solutions were obtained when compared with other algorithms, such as the genetic algorithm and the ant colony optimization algorithm. The harmony search algorithm explored only a small amount of total solution space in order to solve this combinatorial optimization problem. The model in this study has obtained good results with a network of up to 18 nodes, however it is anticipated that the model could be useful to solve bigger networks in practice without any difficult problem.
引用
收藏
页码:711 / 716
页数:6
相关论文
共 50 条
  • [41] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [42] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600
  • [43] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [44] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [45] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [46] Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Ni, Yaodong
    APPLIED MATHEMATICS AND COMPUTATION, 2009, 215 (01) : 308 - 313
  • [47] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
  • [48] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [49] A FLOW-PRESERVING ALGORITHM FOR THE TIME-COST TRADE-OFF PROBLEM
    TUFEKCI, S
    IIE TRANSACTIONS, 1982, 14 (02) : 109 - 113
  • [50] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +