Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search

被引:82
|
作者
Geem, Zong Woo [1 ]
机构
[1] Johns Hopkins Univ, Environm Planning & Management Program, Clarksburg, MD 20871 USA
关键词
Project scheduling; Critical path method; Time-cost trade-off problem; Combinatorial optimization; Harmony search; ALGORITHM; DESIGN; NETWORKS;
D O I
10.1061/(ASCE)CO.1943-7862.0000167
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Completing a project with minimal time as well as minimal cost is a critical factor for scheduling a project. However, because completion speed tends to be correlated with cost (e.g., usually, time can be saved if more workers are hired), the relationship between time and cost is a trade-off. This study employed a phenomenon-mimicking algorithm, harmony search to perform this biobjective trade-off. The harmony search algorithm was applied to two test examples, and good Pareto solutions were obtained when compared with other algorithms, such as the genetic algorithm and the ant colony optimization algorithm. The harmony search algorithm explored only a small amount of total solution space in order to solve this combinatorial optimization problem. The model in this study has obtained good results with a network of up to 18 nodes, however it is anticipated that the model could be useful to solve bigger networks in practice without any difficult problem.
引用
收藏
页码:711 / 716
页数:6
相关论文
共 50 条
  • [21] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486
  • [22] Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization
    Afshar, A.
    Ziaraty, A. Kasaeian
    Kaveh, A.
    Sharifi, F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) : 668 - 674
  • [23] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [24] Time-cost trade-off in PERT networks using a genetic algorithm
    Azaron, A
    Perkgoz, C
    Kato, K
    Katagiri, H
    Sakawa, M
    2004 47TH MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL III, CONFERENCE PROCEEDINGS, 2004, : 57 - 60
  • [26] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [27] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [28] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [29] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [30] MANAGING NEW PRODUCT TIME TO MARKET USING TIME-COST TRADE-OFF METHODS
    HAFFNER, EW
    GRAVES, RJ
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (02): : 117 - 124