A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [31] Research on the Risk Assessment Model in Construction Project's Life Cycle
    Lai Yu
    Luo Fuzhou
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 52 - 55
  • [32] Conceptual Model for the Construction Risk Management Affecting Project Performance in Iraq
    Almaliki, Esraa S.
    Altaay, Meervat R.
    JOURNAL OF ELECTRICAL SYSTEMS, 2024, 20 (09) : 813 - 820
  • [33] Evaluating Construction Project Performance: A Case of Construction SMEs in Lagos, Nigeria
    Tunji-Olayeni, Patience
    Mosaku, Timothy Olusoji
    Fagbenle, Olabosipo Ishola
    Omuh, Ignatius Owoicho
    Joshua, Opeyemi
    VISION 2020: SUSTAINABLE GROWTH, ECONOMIC DEVELOPMENT, AND GLOBAL COMPETITIVENESS, VOLS 1-5, 2014, : 3081 - 3092
  • [34] Evaluating meeting support systems in a building construction project
    Aparicio, Manuela
    Costa, Carlos J.
    Costa, J. Paulo
    Recent Advances in Computers, Computing and Communications, 2002, : 116 - 121
  • [35] An index system for evaluating the stress of construction project managers
    Hong, Zhang
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 422 - 424
  • [36] CBR application research on cost evaluating for construction project
    Chang, CG
    Dong, Y
    Cui, DH
    Cui, W
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 315 - 319
  • [37] Evaluating the Influences of Stakeholder Management on Construction Project Quality
    Heravitorbati, Amirhossein
    Coffey, Vaughan
    Trigunarsyah, Bambang
    Saghatforoush, Ehsan
    INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 258 - 265
  • [38] Framework for Evaluating Management Performance of Construction Project System
    Hu, Wenfa
    He, Xinhua
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1119 - 1122
  • [39] Evaluating and managing construction blasting risk
    Revey, G.F.
    Practice Periodical on Structural Design and Construction, 2001, 6 (01) : 19 - 24
  • [40] An Artificial neural networks (ANN) model for evaluating construction project performance based on coordination factors
    Alaloul, Wesam Salah
    Liew, Mohd Shahir
    Zawawi, Noor Amila Wan
    Mohammed, Bashar S.
    Adamu, Musa
    COGENT ENGINEERING, 2018, 5 (01): : 1 - 18