A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [21] Validation of the model for evaluating client-generated risk by project consultants
    Kometa, S.R.
    Olomolaiye, P.O.
    Harris, F.C.
    Construction Management and Economics, 1996, 14 (02): : 131 - 145
  • [22] Analysis of the most critical index of activities in construction project based on completion risk rate
    Wang, Zhuofu
    Liu, Yuan
    Ding, Jiyong
    TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2012, 7 (04): : 1440 - 1445
  • [23] The application of ahp in evaluating gondola construction project
    Hsu, Wei-Ling (quartback@hotmail.com), 1600, ICIC Express Letters Office (07):
  • [24] Construction risk in project financing
    Fabregat, Marlo Aymerich
    Revista de Obras Publicas, 2002, 149 (3425): : 77 - 84
  • [25] Developing a generic risk maturity model (GRMM) for evaluating risk management in construction projects
    Hoseini, Erfan
    Hertogh, Marcel
    Bosch-Rekveldt, Marian
    JOURNAL OF RISK RESEARCH, 2021, 24 (07) : 889 - 908
  • [26] Research on Law Risks Identification and Evaluating Model in the Whole Process of Engineering Construction Project
    Lai, Yu
    Li, Yong
    Luo, Fuzhou
    TECHNOLOGY FOR EDUCATION AND LEARNING, 2012, 136 : 265 - +
  • [27] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857
  • [28] Construction and Analysis on the Model of Bank Credit Project Comprehensive Risk Management
    Zhang Weiguo
    Zhou Xingmei
    PROCEEDINGS OF THE 5TH INTERNATIONAL SYMPOSIUM FOR CORPORATE GOVERNANCE, BOOKS 1 AND 2, 2009, : 1729 - 1736
  • [29] Construction project network evaluation with correlated schedule risk analysis model
    Okmen, Onder
    Oztas, Ahmet
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (01): : 49 - 63
  • [30] Research in the Risk Control Model of Construction Project Based on Uncertain Theory
    Lin, Feng
    Guan, Jianping
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, 2011, : 93 - 96