A hybrid metaheuristic for the resource-constrained project scheduling problem

被引:69
|
作者
Tseng, Lin-Yu
Chen, Shih-Chieh
机构
[1] Natl Chung Hsing Univ, Dept Comp Sci, Taichung 402, Taiwan
[2] Natl Chung Hsing Univ, Dept Appl Math, Taichung 402, Taiwan
关键词
project scheduling; ant colony optimization; genetic algorithm; local search; metaheuristics;
D O I
10.1016/j.ejor.2005.06.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study presents a hybrid metaheuristic ANGEL for the resource-constrained project scheduling problem (RCPSP). ANGEL combines ant colony optimization (ACO), genetic algorithm (GA) and local search strategy. The procedures of ANGEL are as follows. First, ACO searches the solution space and generates activity lists to provide the initial population for GA. Next, GA is executed and the pheromone set in ACO is updated when GA obtains a better solution. When GA terminates, ACO searches again by using a new pheromone set. ACO and GA search alternately and cooperatively in the solution space. This study also proposes an efficient local search procedure which is applied to yield a better solution when ACO or GA obtains a solution. A final search is applied upon the termination of ACO and GA. The experimental results of ANGEL on the standard sets of the project instances show that ANGEL is an effective method for solving the RCPSP. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:707 / 721
页数:15
相关论文
共 50 条
  • [41] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [42] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
  • [43] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [44] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [45] Improved Compact Models for the Resource-Constrained Project Scheduling Problem
    Tesch, Alexander
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 25 - 30
  • [46] New approaches for solving the resource-constrained project scheduling problem
    Kone, Oumar
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2013, 11 (01): : 93 - 94
  • [47] A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem
    Goncharov E.N.
    Journal of Applied and Industrial Mathematics, 2022, 16 (04) : 672 - 683
  • [48] A survey of variants and extensions of the resource-constrained project scheduling problem
    Hartmann, Soenke
    Briskorn, Dirk
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) : 1 - 14
  • [49] Proactive policies for the stochastic resource-constrained project scheduling problem
    Deblaere, Filip
    Demeulemeester, Erik
    Herroelen, Willy
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 308 - 316
  • [50] Best Insertion Algorithm for Resource-constrained Project Scheduling Problem
    Pesek, Igor
    Zerovnik, Janez
    KOI 2006: 11TH INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH, PROCEEDINGS, 2008, : 169 - 176