A hybrid metaheuristic for the resource-constrained project scheduling problem

被引:69
|
作者
Tseng, Lin-Yu
Chen, Shih-Chieh
机构
[1] Natl Chung Hsing Univ, Dept Comp Sci, Taichung 402, Taiwan
[2] Natl Chung Hsing Univ, Dept Appl Math, Taichung 402, Taiwan
关键词
project scheduling; ant colony optimization; genetic algorithm; local search; metaheuristics;
D O I
10.1016/j.ejor.2005.06.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study presents a hybrid metaheuristic ANGEL for the resource-constrained project scheduling problem (RCPSP). ANGEL combines ant colony optimization (ACO), genetic algorithm (GA) and local search strategy. The procedures of ANGEL are as follows. First, ACO searches the solution space and generates activity lists to provide the initial population for GA. Next, GA is executed and the pheromone set in ACO is updated when GA obtains a better solution. When GA terminates, ACO searches again by using a new pheromone set. ACO and GA search alternately and cooperatively in the solution space. This study also proposes an efficient local search procedure which is applied to yield a better solution when ACO or GA obtains a solution. A final search is applied upon the termination of ACO and GA. The experimental results of ANGEL on the standard sets of the project instances show that ANGEL is an effective method for solving the RCPSP. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:707 / 721
页数:15
相关论文
共 50 条
  • [31] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [32] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [33] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [34] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [35] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [36] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [37] On the summary measures for the resource-constrained project scheduling problem
    Van Eynde, Rob
    Vanhoucke, Mario
    Coelho, Jose
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (02) : 593 - 625
  • [38] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237
  • [39] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
    Zhong, Shisheng
    Fu, Xuyun
    Lin, Lin
    Wang, Guolei
    MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
  • [40] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247