Proactive policies for the stochastic resource-constrained project scheduling problem

被引:100
|
作者
Deblaere, Filip [1 ]
Demeulemeester, Erik [1 ]
Herroelen, Willy [1 ]
机构
[1] Katholieke Univ Leuven, Fac Business & Econ, Res Ctr Operat Management, B-3000 Louvain, Belgium
关键词
Project scheduling; Proactive scheduling; Execution policies; Stochastic RCPSP;
D O I
10.1016/j.ejor.2011.04.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability. We propose a stochastic methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:308 / 316
页数:9
相关论文
共 50 条
  • [1] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Journal of Scheduling, 2019, 22 : 211 - 237
  • [2] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237
  • [3] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Patricio Lamas
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 409 - 428
  • [4] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Lamas, Patricio
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (04) : 409 - 428
  • [5] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
  • [6] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247
  • [7] Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem
    Satic, Ugur
    Jacko, Peter
    Kirkbride, Christopher
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (04) : 1411 - 1423
  • [8] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [9] A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    Yang, Zhen
    Demeulemeester, Erik
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2019, 66 (03) : 459 - 474
  • [10] Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    ANNALS OF OPERATIONS RESEARCH, 2019, 274 (1-2) : 187 - 210