Proactive policies for the stochastic resource-constrained project scheduling problem

被引:100
|
作者
Deblaere, Filip [1 ]
Demeulemeester, Erik [1 ]
Herroelen, Willy [1 ]
机构
[1] Katholieke Univ Leuven, Fac Business & Econ, Res Ctr Operat Management, B-3000 Louvain, Belgium
关键词
Project scheduling; Proactive scheduling; Execution policies; Stochastic RCPSP;
D O I
10.1016/j.ejor.2011.04.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability. We propose a stochastic methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:308 / 316
页数:9
相关论文
共 50 条
  • [21] New strategies for stochastic resource-constrained project scheduling
    Rostami, Salim
    Creemers, Stefan
    Leus, Roel
    JOURNAL OF SCHEDULING, 2018, 21 (03) : 349 - 365
  • [22] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [23] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [24] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    Lambrechts, Olivier
    Demeulemeester, Erik
    Herroelen, Willy
    JOURNAL OF SCHEDULING, 2008, 11 (02) : 121 - 136
  • [25] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    Olivier Lambrechts
    Erik Demeulemeester
    Willy Herroelen
    Journal of Scheduling, 2008, 11 : 121 - 136
  • [26] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [27] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [28] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817
  • [29] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [30] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996