Proactive policies for the stochastic resource-constrained project scheduling problem

被引:100
|
作者
Deblaere, Filip [1 ]
Demeulemeester, Erik [1 ]
Herroelen, Willy [1 ]
机构
[1] Katholieke Univ Leuven, Fac Business & Econ, Res Ctr Operat Management, B-3000 Louvain, Belgium
关键词
Project scheduling; Proactive scheduling; Execution policies; Stochastic RCPSP;
D O I
10.1016/j.ejor.2011.04.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability. We propose a stochastic methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:308 / 316
页数:9
相关论文
共 50 条
  • [31] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [32] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [33] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [34] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [35] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [36] On the summary measures for the resource-constrained project scheduling problem
    Van Eynde, Rob
    Vanhoucke, Mario
    Coelho, Jose
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (02) : 593 - 625
  • [37] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
    Zhong, Shisheng
    Fu, Xuyun
    Lin, Lin
    Wang, Guolei
    MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
  • [38] Simulation based approach for improving heuristics in stochastic resource-constrained project scheduling problem
    Choi, J
    Lee, JH
    Realff, MJ
    PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 439 - 444
  • [39] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
    Guo, Fang Ming
    Ma, Li
    He, Min
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
  • [40] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036