Optimization of construction time-cost trade-off analysis using genetic algorithms

被引:138
|
作者
Hegazy, T [1 ]
机构
[1] Univ Waterloo, Dept Civil Engn, Waterloo, ON N2L 3G1, Canada
关键词
computer application; time-cost trade-off; construction management; genetic algorithms; optimization;
D O I
10.1139/cjce-26-6-685
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the management of a construction project, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost trade-off (TCT) problem, which has been studied extensively in the project management literature. TCT decisions, however, are complex and require planners to select appropriate resources for each project task, including crew size, equipment, methods, and technology. As combinatorial optimization problems, finding optimal decisions is difficult and time consuming considering the number of possible permutations involved. In this paper, a practical model for TCT optimization is developed using the principle of genetic algorithms (GAs). With its robust optimization search, the GAs model minimizes the total project cost as an objective function and accounts for project-specific constraints on time and cost. To maximize its benefits, the model has been implemented as a VBA macro program. This automates TCT analysis and combines it with standard resource-management procedures. Details of the proposed TCT model are described and several experiments conducted to demonstrate its benefits. The developments made in this paper provide guidelines for designing and implementing practical GA applications in the civil engineering domain.
引用
收藏
页码:685 / 697
页数:13
相关论文
共 50 条
  • [21] THE TIME-COST TRADE-OFF ANALYSIS IN CONSTRUCTION PROJECT USING COMPUTER SIMULATION AND INTERACTIVE PROCEDURE
    Blaszczyk, Tomasz
    Nowak, Maciej
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2009, 15 (04) : 523 - 539
  • [22] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [23] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [25] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off
    Kaveh, Ali
    Khanzadi, Mostafa
    Alipour, Majid
    Naraky, Mohammad Rajabi
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371
  • [26] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [27] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [28] A hybrid genetic algorithm for the discrete time-cost trade-off problem
    Sonmez, Rifat
    Bettemir, Onder Halis
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (13) : 11428 - 11434
  • [29] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [30] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822