Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal

被引:46
|
作者
Gilbert, Alexander [1 ]
Sovacool, Benjamin K. [2 ,3 ]
Johnstone, Phil [2 ]
Stirling, Andy [2 ]
机构
[1] Spark Lib, Washington, DC 89431 USA
[2] Univ Sussex, Sch Business Management & Econ, Sci Policy Res Unit SPRU, Brighton, E Sussex, England
[3] Aarhus Univ, Ctr Energy Technol, Dept Business Dev & Technol, Birk Centerpark 15, Aarhus, Denmark
关键词
Construction cost overrun; Nuclear power; Nuclear energy; Atomic energy; ENERGY;
D O I
10.1016/j.enpol.2016.04.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
Lovering and colleagues attempt to advance understanding of construction cost escalation risks inherent in building nuclear reactors and power plants, a laudable goal. Although we appreciate their focus on capital cost increases and overruns, we maintain in this critical appraisal that their study conceptualizes cost issues in a limiting way. Methodological choices in treating different cost categories by the authors mean that their conclusions are more narrowly applicable than they describe. We also argue that their study is factually incorrect in its criticism of the previous peer-reviewed literature. Earlier work, for instance, has compared historical construction costs for nuclear reactors with other energy sources, in many countries, and extending over several decades. Lastly, in failing to be transparent about the limitations of their own work, Lovering et al. have recourse to a selective choice of data, unbalanced analysis, and biased interpretation. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:644 / 649
页数:6
相关论文
共 50 条
  • [11] COST OF DELAYS IN CONSTRUCTION OF NUCLEAR-POWER STATIONS
    TRENKLER, H
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1976, 21 (05): : 246 - 250
  • [12] Estimated decommissioning cost for the 23 operating nuclear power reactors in Korea
    Moon, Joo Hyun
    ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2013, 58 (07): : 420 - +
  • [13] BENEFIT-COST ANALYSES IN LICENSING OF NUCLEAR-POWER REACTORS
    HILL, RM
    BRYAN, RH
    NICHOLS, BL
    NUCLEAR SAFETY, 1974, 15 (06): : 665 - 673
  • [14] Construction schedule and cost risk for large and small light water reactors
    Stewart, W. Robb
    Shirvan, Koroush
    NUCLEAR ENGINEERING AND DESIGN, 2023, 407
  • [15] Cost risk of construction of small hydroelectric power plants
    Gorecki, Jarosaw
    Poszaj, Ewa
    MATEC Web of Conferences, 2019, 262
  • [16] Cost risk of construction of small hydroelectric power plants
    Gorecki, Jaroslaw
    Ploszaj, Ewa
    64THSCIENTIFIC CONFERENCE OF THE COMMITTEE FOR CIVIL ENGINEERING OF THE POLISH ACADEMY OF SCIENCES AND THE SCIENCE COMMITTEE OF THE POLISH ASSOCIATION OF CIVIL ENGINEERS (PZITB) (KRYNICA 2018), 2019, 262
  • [17] SAFETY STANDARDS FOR NUCLEAR POWER REACTORS AND CALCULATION OF ENSUING RADIOLOGICAL RISK
    BELL, GD
    HEALTH PHYSICS, 1970, 19 (01): : 156 - +
  • [18] Integration of multiphase science and technology with risk management in nuclear power reactors
    Theofanous, Theo G.
    Dinh, True-Nam
    Multiphase Science and Technology, 2008, 20 (02) : 81 - 211
  • [19] CANADIAN NUCLEAR-POWER-PLANT CONSTRUCTION COST FORECAST AND ANALYSIS
    KENG, CWK
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 49 : 146 - 171
  • [20] Dynamic cost control information system for nuclear power plant construction
    Tsinghua Univ, Beijing, China
    Hedongli Gongcheng, 3 (203-207):