共 50 条
- [21] Nuclear Power, Risk Management and Democratic Accountability in Indonesia: Volcanic, regulatory and financial risk in the Muria peninsula nuclear power proposal ASIA-PACIFIC JOURNAL-JAPAN FOCUS, 2009, 7 (51):
- [22] CRITICAL ANALYSIS OF EXPERIMENTAL APPARATUS FOR NOISE-POWER SPECTRUM MEASUREMENTS IN NUCLEAR REACTORS ENERGIA NUCLEARE, 1966, 13 (03): : 105 - &
- [24] Cost analysis and risk supervision of project in electric power construction PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE, EDUCATION TECHNOLOGY, ARTS, SOCIAL SCIENCE AND ECONOMICS (MSETASSE-16), 2016, 85 : 1544 - 1547
- [25] NUCLEAR-POWER, SYSTEMATIC-RISK, AND THE COST OF CAPITAL CONTEMPORARY POLICY ISSUES, 1991, 9 (01): : 73 - 82
- [26] Development of the JSME rules on design and construction for nuclear power plants (Division 2: Fast Reactors) Nihon Kikai Gakkai Ronbunshu, A Hen/Transactions of the Japan Society of Mechanical Engineers, Part A, 2012, 78 (790): : 778 - 782
- [27] THE COMPULSORY TECHNOLOGICAL REGULATIONS FOR THE CONSTRUCTION OF NUCLEAR-POWER PLANTS WITH THE WWER1000 REACTORS JADERNA ENERGIE, 1983, 29 (8-9): : 287 - 293
- [28] UNDERGROUND SITING OF NUCLEAR POWER PLANTS - ENHANCING SAFETY AND REDUCING CONSTRUCTION COST PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 3, 2014,