Analysis of Dalian Subway Tunnel Shield Construction Impact with Engineering Materials and Engineering Mechanics on Existing Bridge Pier

被引:1
|
作者
Li, Jinkui [1 ]
Hou, Qinghao [1 ]
Liang, Wenjing [1 ]
机构
[1] Dalian Univ, Civil Engn Coll, Dalian 116600, Peoples R China
关键词
shield construction; existing bridge; surface subsidence; pier settlement;
D O I
10.4028/www.scientific.net/AMR.848.96
中图分类号
O69 [应用化学];
学科分类号
081704 ;
摘要
In the 202 section of subway shield Dalian interval in close proximity to existing bridge as the basis, the surface settlement and bridge pier settlement observation station are established. By the 62 day of the crossing construction monitoring, the monitoring data are analyzed in detail. When surface subsidence induced by shield tunnel construction, above the measuring point start speed is faster than settling startup speed measuring points on both sides, about 2-2.5 times, subsidence range higher about 8 to 10 m ahead of time. Away from the pier side first started, and start faster than the side near the pier,is about 1.2 times, settlement of shield construction are mainly concentrated in the distance before and after the excavation of shield machine 10 m, accounting for 80.72%-81.6% of the total settlement. At highest risk for shield construction area, we should strengthen monitoring and make contingency plans in a timely manner.
引用
收藏
页码:96 / 99
页数:4
相关论文
共 50 条
  • [31] Risk analysis of tunnel shield machine driving-in and driving-out construction process in tunnelling engineering
    Yang, D. L.
    Zheng, R. J.
    Guo, H. Z.
    MODELLING AND COMPUTATION IN ENGINEERING, 2010, : 191 - 195
  • [32] Road, Bridge and Tunnel Engineering Construction Strengthening Technology of Grouting Method in Application
    Jin, Pengtao
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 456 - 459
  • [33] Construction Safety Risk Analysis of Subway Tunnel Undercrossing Bridge U-slot
    Zhang Chengping
    Li Limin
    Zhang Dingli
    Luo Jianjun
    Jiang Long
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 467 - 470
  • [34] INFLUENCE LAW ANALYSIS OF SHIELD TUNNEL CROSS BENEATH EXISTING LINE CONSTRUCTION IN BEIJING
    Ma, Zhenchao
    Bai, Yan
    Shen, Yupeng
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 586 - 590
  • [35] Effect of foundation pit excavation and structural construction of new engineering on existing underlying tunnel
    Xu Chang-jie
    Wang Yi-li
    Xu Yuan-lei
    Wang Jin-chang
    ROCK AND SOIL MECHANICS, 2015, 36 (11) : 3201 - 3209
  • [36] The Comparison of Tunnel Engineering Construction Methods ForRenhechang Tunnel Crossing Underneath Existing Tunnel On Lanzhou-Chongqing Railway
    Sui, Chuanyi
    Zhou, Xudong
    Wang, Linhui
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1330 - 1333
  • [37] Analysis of Vibration Characteristics of New Subway Tunnel Undercrossing the Existing Highway under Blasting Construction
    Hu, Dehua
    Duan, Jingchuan
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (13): : 4781 - 4786
  • [38] Analysis of Vibration Characteristics of New Subway Tunnel Undercrossing the Existing Highway Under Blasting Construction
    Hu, De-hua
    Duan, Jing-chuan
    INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND CIVIL ENGINEERING, MSCE 2016, 2016, : 475 - 480
  • [39] Research and Application of Slope Stability Analysis Method based on Engineering Mechanics and Engineering Materials
    Feng, Shaojie
    Sun, Shiguo
    Zhao, Xuefang
    Tan, Liang
    ADVANCED RESEARCH ON MATERIAL SCIENCE, ENVIROMENT SCIENCE AND COMPUTER SCIENCE III, 2014, 886 : 432 - +
  • [40] Analysis of engineering land subsidence effects caused by shield construction for tunnels
    Yang Tianliang
    Yan Xuexin
    Wang Hanmei
    Zhan Longxi
    Xu Zhun
    Zhuang Yibin
    LAND SUBSIDENCE, ASSOCIATED HAZARDS AND THE ROLE OF NATURAL RESOURCES DEVELOPMENT, 2010, 339 : 238 - 245