共 50 条
- [22] Analysis of the displacement caused by shield-driven construction adjacent to the existing tunnel PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1413 - 1418
- [23] Construction Plan and Risk Analysis of New Subway Tunnel Passing Beneath Existing Subway Station and Slurry Walls 2015 INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ROCK ENGINEERING, ICCERE 2015, 2015, : 451 - 457
- [25] Analysis of effect on existing bridge piles induced by shallow tunneling construction of Beijing Subway Rock Soil Mech, 2006, SUPPL. (477-482):
- [26] Construction Mechanics and Time-Varying Mechanics in Civil Engineering Analysis Proceedings of the 2016 4th International Conference on Machinery, Materials and Information Technology Applications, 2016, 71 : 1173 - 1176