Analysis of Dalian Subway Tunnel Shield Construction Impact with Engineering Materials and Engineering Mechanics on Existing Bridge Pier

被引:1
|
作者
Li, Jinkui [1 ]
Hou, Qinghao [1 ]
Liang, Wenjing [1 ]
机构
[1] Dalian Univ, Civil Engn Coll, Dalian 116600, Peoples R China
关键词
shield construction; existing bridge; surface subsidence; pier settlement;
D O I
10.4028/www.scientific.net/AMR.848.96
中图分类号
O69 [应用化学];
学科分类号
081704 ;
摘要
In the 202 section of subway shield Dalian interval in close proximity to existing bridge as the basis, the surface settlement and bridge pier settlement observation station are established. By the 62 day of the crossing construction monitoring, the monitoring data are analyzed in detail. When surface subsidence induced by shield tunnel construction, above the measuring point start speed is faster than settling startup speed measuring points on both sides, about 2-2.5 times, subsidence range higher about 8 to 10 m ahead of time. Away from the pier side first started, and start faster than the side near the pier,is about 1.2 times, settlement of shield construction are mainly concentrated in the distance before and after the excavation of shield machine 10 m, accounting for 80.72%-81.6% of the total settlement. At highest risk for shield construction area, we should strengthen monitoring and make contingency plans in a timely manner.
引用
收藏
页码:96 / 99
页数:4
相关论文
共 50 条
  • [1] Impact of subway shield tunnel construction on deformation of existing utility tunnel
    Wei, Shi
    Zenglin, Hong
    Min, Yang
    Ning, Li
    Tianxiang, Tan
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [2] Bridge Pier Displacement Prediction and Control in Subway Tunnel Construction
    Huang, Zhaozhao
    Wang, Jingwen
    Journal of Engineering, Project, and Production Management, 2024, 14 (01)
  • [3] NUMERICAL SIMULATION ANALYSIS OF SHIELD TUNNEL UNDERCROSSING EXISTING SUBWAY SHIELD SECTION
    Peng, Hua
    Shi, Jianze
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 676 - 680
  • [4] Risk Analysis of Tunnel Shield Machine Driving-in and Driving-out Construction Process in Zhengzhou Subway Engineering
    Qiao, Jingshun
    Yang, Delei
    Liu, Huawei
    Guo, Haizhu
    Liu, Lingyun
    Jia, Zhigang
    CHINESE PERSPECTIVE ON RISK ANALYSIS AND CRISIS RESPONSE, 2010, 13 : 879 - +
  • [5] A General Framework for the Impact of Shield Tunnel Construction on Existing Tunnel in Soil
    Wang, Pingrang
    Wu, Junhao
    Song, Danqing
    Zhang, Mingfei
    SUSTAINABILITY, 2023, 15 (12)
  • [6] Risk assessment on subway tunnel engineering during construction process
    Wang, Jing
    Tan, Yue-Hu
    Wang, Peng-Fei
    Jiang, Wei
    Jiefangjun Ligong Daxue Xuebao/Journal of PLA University of Science and Technology (Natural Science Edition), 2009, 10 (04): : 379 - 383
  • [7] Controlling of construction parameters on metro shield tunneling traversing adjacently under the existing subway tunnel
    Zou, Chunhua
    Zhou, Shunhua
    Sun, Yuyong
    Dai, Renping
    Wang, Changdan
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 208 - 212
  • [8] Vibration analysis of the impact of the blasting construction of a power tunnel crossing underneath an existing subway station
    Gu, Zhimin
    Sun, Bingfeng
    Cui, Xiaoqing
    Guo, Hong
    World of Mining - Surface and Underground, 2020, 72 (02): : 86 - 92
  • [9] Analysis of influence of undercrossing subway shield tunneling construction on the overlying tunnel
    Fang, Yong
    He, Chuan
    Tiedao Xuebao/Journal of the China Railway Society, 2007, 29 (02): : 83 - 88
  • [10] THE DEFORMATION IMPACT ANALYSIS OF SHIELD TUNNEL TRAVERSE THE EXISTING HIGH-SPEED RAILWAY BRIDGE
    Liang, Yu
    Peng, Hua
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 909 - 914