Time-Profit Trade-Off Analysis for Construction Projects

被引:21
|
作者
Senouci, Ahmed [1 ]
El-Rayes, Khaled [2 ]
机构
[1] Univ Qatar, Dept Civil Engn, Doha, Qatar
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
关键词
GENETIC ALGORITHMS;
D O I
10.1061/(ASCE)CO.1943-7862.0000031
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a multiobjective optimization model that provides new and unique capabilities including generating and evaluating optimal/near-optimal construction resource utilization and scheduling plans that simultaneously minimize the time and maximize the profit of construction projects. The computations in the present model are organized in three major modules: (1) a scheduling module that develops practical schedules for construction projects; (2) a profit module that computes the project profit; and (3) a multiobjective module that searches for and identifies optimal/near optimal trade-offs between project time and profit. A large-scale construction project is analyzed to illustrate the use of the model and to demonstrate its capabilities in generating and visualizing optimal trade-offs between construction time and profit.
引用
收藏
页码:718 / 725
页数:8
相关论文
共 50 条
  • [41] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
  • [42] Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Hatamleh, Muhammad T.
    Song, Siyuan
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [43] A computer Time Trade-Off: a feasible and reliable alternative for the interview Time Trade-Off in rheumatoid arthritis
    Buitinga, L.
    Braakman-Jansen, L. M. A.
    Taal, E.
    van de Laar, M. A. F. J.
    CLINICAL AND EXPERIMENTAL RHEUMATOLOGY, 2011, 29 (05) : 783 - 789
  • [44] FORECASTING WITH TRADE-OFF ANALYSIS
    PERHAM, JC
    DUNS REVIEW, 1977, 109 (03): : 87 - &
  • [45] Principal trade-off analysis
    Strang, Alexander
    Sewell, David
    Kim, Alexander
    Alcedo, Kevin
    Rosenbluth, David
    INFORMATION VISUALIZATION, 2024, 23 (03) : 258 - 271
  • [46] Time preference bias in time trade-off
    Van Der Pol M.
    Roux L.
    The European Journal of Health Economics, 2005, 6 (2) : 107 - 111
  • [47] TIME-SPACE TRADE-OFF
    PIPPENGER, N
    JOURNAL OF THE ACM, 1978, 25 (03) : 509 - 515
  • [48] A consistency test of the time trade-off
    Bleichrodt, H
    Pinto, JL
    Abellan-Perpiñan, JM
    JOURNAL OF HEALTH ECONOMICS, 2003, 22 (06) : 1037 - 1052
  • [49] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [50] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321