Time-Profit Trade-Off Analysis for Construction Projects

被引:21
|
作者
Senouci, Ahmed [1 ]
El-Rayes, Khaled [2 ]
机构
[1] Univ Qatar, Dept Civil Engn, Doha, Qatar
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
关键词
GENETIC ALGORITHMS;
D O I
10.1061/(ASCE)CO.1943-7862.0000031
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a multiobjective optimization model that provides new and unique capabilities including generating and evaluating optimal/near-optimal construction resource utilization and scheduling plans that simultaneously minimize the time and maximize the profit of construction projects. The computations in the present model are organized in three major modules: (1) a scheduling module that develops practical schedules for construction projects; (2) a profit module that computes the project profit; and (3) a multiobjective module that searches for and identifies optimal/near optimal trade-offs between project time and profit. A large-scale construction project is analyzed to illustrate the use of the model and to demonstrate its capabilities in generating and visualizing optimal trade-offs between construction time and profit.
引用
收藏
页码:718 / 725
页数:8
相关论文
共 50 条
  • [31] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction
    Xie, Haiyan
    Sumam, Rugma Jayachandrakumar
    Carey, Nicholas
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
  • [32] A comparison of standard gamble, time trade-off, and adjusted time trade-off scores
    Martin, AJ
    Glasziou, PP
    Simes, RJ
    Lumley, T
    INTERNATIONAL JOURNAL OF TECHNOLOGY ASSESSMENT IN HEALTH CARE, 2000, 16 (01) : 137 - 147
  • [33] Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
    Albayrak, Gulcag
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2023, 67 (03): : 806 - 818
  • [34] The value of trade-off studies for student projects
    Kindem, Håkon
    Haskins, Cecilia
    INCOSE International Symposium, 2021, 31 (01) : 889 - 906
  • [35] The proximity-concentration trade-off with profit shifting
    Amerighi, Oscar
    Peralta, Susana
    JOURNAL OF URBAN ECONOMICS, 2010, 68 (01) : 90 - 101
  • [36] Probability and Time Trade-Off
    Baucells, Manel
    Heukamp, Franz H.
    MANAGEMENT SCIENCE, 2012, 58 (04) : 831 - 842
  • [37] Profit-fairness trade-off in project selection
    Naldi, Maurizio
    Nicosia, Gaia
    Pacifici, Andrea
    Pferschy, Ulrich
    SOCIO-ECONOMIC PLANNING SCIENCES, 2019, 67 : 133 - 146
  • [38] Cumulative VRP with Time Windows: A Trade-Off Analysis
    Fernandez Gil, Alejandro
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Castro, Carlos
    COMPUTATIONAL LOGISTICS, ICCL 2020, 2020, 12433 : 277 - 291
  • [39] Optimizing sustainable construction projects through LNSGA III: a time-cost-environmental impact trade-off approach
    Bohra P.
    Verma R.S.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 4343 - 4354
  • [40] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044