共 50 条
- [31] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
- [33] Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2023, 67 (03): : 806 - 818
- [38] Cumulative VRP with Time Windows: A Trade-Off Analysis COMPUTATIONAL LOGISTICS, ICCL 2020, 2020, 12433 : 277 - 291
- [40] Construction time-cost trade-off analysis using ant colony optimization algorithm PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044