Wuhan - Guangzhou Passenger Dedicated Line (WGPDL)-1000 km Highspeed-Railway-Line in Central China

被引:0
|
作者
Kreutzer, M. [1 ]
Kirschke, D. [2 ]
Vogt, L. [3 ]
机构
[1] OBERMEYER Planen Beraten GmbH, D-80686 Munich, Germany
[2] Beratender Ingenieur Felsmech & Tunnelbau, D-76275 Ettlingen, Germany
[3] Baugrund Dresden Ingenieurgesell mbH, D-01097 Dresden, Germany
来源
BAUINGENIEUR | 2009年 / 84卷
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The German engineering and architectural consultancy OBERMEYER is currently entrusted with extensive advisory services for the design and construction of the almost 1000 km long highspeed railway line from Wuhan to Guangzhou in central China. The present article addresses the sectors earthworks, tunnel construction and slab track by way of example.
引用
收藏
页码:185 / 194
页数:10
相关论文
共 46 条