Wuhan - Guangzhou Passenger Dedicated Line (WGPDL)-1000 km Highspeed-Railway-Line in Central China

被引:0
|
作者
Kreutzer, M. [1 ]
Kirschke, D. [2 ]
Vogt, L. [3 ]
机构
[1] OBERMEYER Planen Beraten GmbH, D-80686 Munich, Germany
[2] Beratender Ingenieur Felsmech & Tunnelbau, D-76275 Ettlingen, Germany
[3] Baugrund Dresden Ingenieurgesell mbH, D-01097 Dresden, Germany
来源
BAUINGENIEUR | 2009年 / 84卷
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The German engineering and architectural consultancy OBERMEYER is currently entrusted with extensive advisory services for the design and construction of the almost 1000 km long highspeed railway line from Wuhan to Guangzhou in central China. The present article addresses the sectors earthworks, tunnel construction and slab track by way of example.
引用
收藏
页码:185 / 194
页数:10
相关论文
共 46 条
  • [31] Optimization of Basic Train Diagram Data for Railway Passenger Dedicated Line Network Based on Ant Colony Algorithms
    Pan Deng
    Zhang Chuansheng
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 2366 - 2371
  • [32] Introduction to treatment of collapsible loess subgrade for Shaanxi section of Zhengzhou-Xi'an passenger dedicated railway line
    Wang Ying-ming
    Li Xiao-lun
    ROCK AND SOIL MECHANICS, 2009, 30 : 283 - 286
  • [33] Distributed Hierarchical Control for Railway Passenger-Dedicated Line Intelligent Transportation System Based on Multi-Agent
    Sun, Jingdong
    Wang, Yao
    Wang, Shan
    ADVANCES IN SWARM INTELLIGENCE, PT 2, PROCEEDINGS, 2010, 6146 : 252 - +
  • [34] Comprehensive Revisions on Fault-Location Algorithm Suitable for Dedicated Passenger Line of High-Speed Electrified Railway
    Wang, Chuanqi
    Yin, Xianggen
    IEEE TRANSACTIONS ON POWER DELIVERY, 2012, 27 (04) : 2415 - 2417
  • [35] Traveling Wave Fault Location Scheme For Jing-Jin Dedicated Passenger Line Electric Railway Traction System
    Xia, MingChao
    Wu, MingLi
    2009 INTERNATIONAL CONFERENCE ON POWER ENGINEERING, ENERGY AND ELECTRICAL DRIVES, 2009, : 436 - 438
  • [36] Study on Structure Safety of the Tunnel Secondary Lining of Passenger Dedicated Line for High-Speed Railway during Service Period
    Liu, Yan
    APPLIED ENERGY TECHNOLOGY, PTS 1 AND 2, 2013, 724-725 : 1689 - 1692
  • [37] A practical model for the train-set utilization: The case of Beijing-Tianjin passenger dedicated line in China
    Zhou, Yu
    Zhou, Leishan
    Wang, Yun
    Li, Xiaomeng
    Yang, Zhuo
    PLOS ONE, 2017, 12 (05):
  • [38] Study on Reasonable Fastener Stiffness of Ballastless Turnout's Vibration Decrease and Noise Reduction of 350 km/h Passenger Dedicated Line
    Xu, Jing Mang
    Weng, Ping
    Xu, Da Zhen
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT I, PTS 1-3, 2012, 105-107 : 1175 - +
  • [40] Research on Seismic Mitigation System of The Yellow River Road-cum-Railway Bridge of Shijiazhuang-Jinan Passenger-Dedicated Line
    Quan, Wei
    Yu, Hong-ming
    Zhao, Shi-Chao
    Wang, Dong-sheng
    2018 3RD INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2018, : 73 - 78