Durability design of anchors in tunnel engineering A case study for the Brenner Base Tunnel

被引:0
|
作者
Rieder, Anton [1 ]
Strauss, Alfred [2 ]
机构
[1] Brenner Basistunnel BBT SE, A-6020 Innsbruck, Austria
[2] Univ Bodenkultur Wien, Inst Konstruktiven Ingn Bau, A-1190 Vienna, Austria
关键词
Tunnel engineering; rock anchors; durability; reliability; Monte Carlo simulation; FORM; monitoring;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In tunnel engineering specific anchors are used for local stabilization of the rock immediately after excavation. Since the structural inner shell usually is realized within a short period after excavation, the anchors are designed for a very limited service life. The durability of the anchors depends strongly on the local conditions of the surrounding rock i.e. presence of water, chemical composition of the water and geological/geotechnical uncertainties related with the rock mass. The 1.8 km long access tunnel "Mules" on the Italian side of the Brenner Base Tunnel has been excavated by drill and blast and is supported by shotcrete, reinforcement mesh and friction expansion anchors (Swellex). Since anchor corrosion can't be excluded probabilistic calculations are performed taking into account various corrosion scenarios. A monitoring program is developed in order to ensure the safety and reliability of the temporary anchors in the time interval between excavation of the tunnel and realization of the inner shell. The monitoring activities consist in visual inspection, convergence measurements and pullout tests on anchors. In the case that critical parameters are exceeded, rehabilitation and/or strengthening measures are recommended.
引用
收藏
页码:98 / 103
页数:6
相关论文
共 50 条
  • [31] ENVIRONMENTAL OPTIMISATION OF SHOTCRETE APPLIED AT THE BRENNER BASE TUNNEL (BBT)
    Cordes, T.
    Gschoesser, F.
    Bergmeister, K.
    EXPANDING BOUNDARIES: SYSTEMS THINKING IN THE BUILT ENVIRONMENT, 2016, : 720 - 724
  • [32] Statistical and Geostatistical Analysis of Drilling Parameters in the Brenner Base Tunnel
    Daniela Boldini
    Roberto Bruno
    Harald Egger
    Daniele Stafisso
    Antonio Voza
    Rock Mechanics and Rock Engineering, 2018, 51 : 1955 - 1963
  • [33] Exploitation of geothermal energy using tunnel lining technology in a mountain environment. A feasibility study for the Brenner Base tunnel - BBT
    Tinti, Francesco
    Boldini, Daniela
    Ferrari, Marco
    Lanconelli, Matteo
    Kasmaee, Sara
    Bruno, Roberto
    Egger, Harald
    Voza, Antonio
    Zurlo, Raffaele
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 70 : 182 - 203
  • [34] Effects of the geometric position of the Brenner Base Tunnel on rock mass plastification and the tunnel's shotcrete shell
    Bergmeister, Konrad
    Weifner, Tassilo
    Collizzolli, Mara
    BETON- UND STAHLBETONBAU, 2012, 107 (11) : 735 - 748
  • [35] Aicha-Mauls on the Brenner base tunnel -status of the works and results
    Bergmeister, Konrad
    Facchin, Ezio
    Quick, Hubert
    Michael, Joachim
    Geomechanik und Tunnelbau, 2010, 3 (05): : 520 - 533
  • [36] Planning optimisation for the Brenner Base Tunnel considering both maintenance and sustainability
    Planungsoptimierungen beim Brenner Basistunnel aus Sicht der Instandhaltung und Nachhaltigkeit
    1600, Ernst und Sohn (07):
  • [37] Study of luminous distribution design of tunnel base lighting
    2016, The Illuminating Engineering Institute of Japan (100):
  • [38] Tunnelling in complex geological structures during the construction of the Brenner Base Tunnel
    Marini, David
    Lussu, Andrea
    Hofmann, Matthias
    Venditti, Giuseppe
    Geomechanik und Tunnelbau, 2024, 17 (06): : 594 - 604
  • [39] Brenner Base Tunnel - description of the work and progress through the periadrial fault
    Zurlo, R.
    Rea, G.
    Roccia, M.
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2014, (109): : 57 - 60
  • [40] CIVIL ENGINEERING AND TUNNEL DESIGN
    FARROW, JP
    CLAYE, PM
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1994, 102 : 23 - 33