首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
Statistical and Geostatistical Analysis of Drilling Parameters in the Brenner Base Tunnel
被引:0
|
作者
:
Daniela Boldini
论文数:
0
引用数:
0
h-index:
0
机构:
University of Bologna,Department of Civil, Chemical, Environmental and Material Engineering (DICAM)
Daniela Boldini
Roberto Bruno
论文数:
0
引用数:
0
h-index:
0
机构:
University of Bologna,Department of Civil, Chemical, Environmental and Material Engineering (DICAM)
Roberto Bruno
Harald Egger
论文数:
0
引用数:
0
h-index:
0
机构:
University of Bologna,Department of Civil, Chemical, Environmental and Material Engineering (DICAM)
Harald Egger
Daniele Stafisso
论文数:
0
引用数:
0
h-index:
0
机构:
University of Bologna,Department of Civil, Chemical, Environmental and Material Engineering (DICAM)
Daniele Stafisso
Antonio Voza
论文数:
0
引用数:
0
h-index:
0
机构:
University of Bologna,Department of Civil, Chemical, Environmental and Material Engineering (DICAM)
Antonio Voza
机构
:
[1]
University of Bologna,Department of Civil, Chemical, Environmental and Material Engineering (DICAM)
[2]
Galleria di Base del Brennero - Brenner Basistunnel BBT-SE,undefined
来源
:
Rock Mechanics and Rock Engineering
|
2018年
/ 51卷
关键词
:
Brenner Base Tunnel (BBT);
Drilling Parameters;
East Tunnel;
Exploratory Tunnel;
Tunnel Face;
D O I
:
暂无
中图分类号
:
学科分类号
:
摘要
:
引用
收藏
页码:1955 / 1963
页数:8
相关论文
共 50 条
[1]
Statistical and Geostatistical Analysis of Drilling Parameters in the Brenner Base Tunnel
论文数:
引用数:
h-index:
机构:
Boldini, Daniela
Bruno, Roberto
论文数:
0
引用数:
0
h-index:
0
机构:
Univ Bologna, Dept Civil Chem Environm & Mat Engn DICAM, Via Terracini 28, I-40131 Bologna, Italy
Univ Bologna, Dept Civil Chem Environm & Mat Engn DICAM, Via Terracini 28, I-40131 Bologna, Italy
Bruno, Roberto
Egger, Harald
论文数:
0
引用数:
0
h-index:
0
机构:
Galleria Base Brennero Brenner Basistunnel BBT SE, Piazza Stn 1, I-39100 Bolzano, Italy
Univ Bologna, Dept Civil Chem Environm & Mat Engn DICAM, Via Terracini 28, I-40131 Bologna, Italy
Egger, Harald
Stafisso, Daniele
论文数:
0
引用数:
0
h-index:
0
机构:
Univ Bologna, Dept Civil Chem Environm & Mat Engn DICAM, Via Terracini 28, I-40131 Bologna, Italy
Univ Bologna, Dept Civil Chem Environm & Mat Engn DICAM, Via Terracini 28, I-40131 Bologna, Italy
Stafisso, Daniele
Voza, Antonio
论文数:
0
引用数:
0
h-index:
0
机构:
Galleria Base Brennero Brenner Basistunnel BBT SE, Piazza Stn 1, I-39100 Bolzano, Italy
Univ Bologna, Dept Civil Chem Environm & Mat Engn DICAM, Via Terracini 28, I-40131 Bologna, Italy
Voza, Antonio
ROCK MECHANICS AND ROCK ENGINEERING,
2018,
51
(06)
: 1955
-
1963
[2]
Brenner Base Tunnel
不详
论文数:
0
引用数:
0
h-index:
0
不详
GALLERIE E GRANDI OPERE SOTTERRANEE,
2022,
(143):
: 53
-
55
[3]
Brenner Base Tunnel
不详
论文数:
0
引用数:
0
h-index:
0
不详
GALLERIE E GRANDI OPERE SOTTERRANEE,
2022,
(144):
: 73
-
75
[4]
Brenner Base Tunnel
不详
论文数:
0
引用数:
0
h-index:
0
不详
GALLERIE E GRANDI OPERE SOTTERRANEE,
2023,
(148):
[5]
Brenner Base Tunnel
不详
论文数:
0
引用数:
0
h-index:
0
不详
GALLERIE E GRANDI OPERE SOTTERRANEE,
2023,
(145):
: 40
-
42
[6]
Brenner Base Tunnel
GALLERIE E GRANDI OPERE SOTTERRANEE,
2021,
(139):
: 73
-
74
[7]
The Brenner Base Tunnel
GALLERIE E GRANDI OPERE SOTTERRANEE,
2021,
(138):
: 65
-
66
[8]
Brenner Base Tunnel
不详
论文数:
0
引用数:
0
h-index:
0
不详
GALLERIE E GRANDI OPERE SOTTERRANEE,
2021,
(140):
: 59
-
61
[9]
RISK ANALYSIS OF THE BRENNER BASE TUNNEL PROJECT
Alfreider, Daniel
论文数:
0
引用数:
0
h-index:
0
机构:
BBT SE, Galleria Base Brennero Brenner Basistunnel, Project Planning Cost Management, Piazza Stn 1, I-39100 Bolzano, Italy
BBT SE, Galleria Base Brennero Brenner Basistunnel, Project Planning Cost Management, Piazza Stn 1, I-39100 Bolzano, Italy
Alfreider, Daniel
Tamparopoulos, Alexios
论文数:
0
引用数:
0
h-index:
0
机构:
Univ Bodenkultur Wien, Dept Struct Engn & Nat Hazards, A-1190 Vienna, Austria
BBT SE, Galleria Base Brennero Brenner Basistunnel, Project Planning Cost Management, Piazza Stn 1, I-39100 Bolzano, Italy
Tamparopoulos, Alexios
Bergmeister, Konrad
论文数:
0
引用数:
0
h-index:
0
机构:
BBT SE, Galleria Base Brennero Brenner Basistunnel, Project Planning Cost Management, Piazza Stn 1, I-39100 Bolzano, Italy
Bergmeister, Konrad
FIB SYMPOSIUM PRAGUE 2011: CONCRETE ENGINEERING FOR EXCELLENCE AND EFFICIENCY, VOLS 1 AND 2,
2011,
: 895
-
898
[10]
Construction of the Brenner Base Tunnel
Bergmeister, K.
论文数:
0
引用数:
0
h-index:
0
机构:
Vorstand Brenner Basistunnel SE, A-6020 Innsbruck, Austria
Univ Nat Resources & Appl Life Sci Vienna, Inst Konstruktivem Ingenieurbau, A-1190 Vienna, Austria
Vorstand Brenner Basistunnel SE, A-6020 Innsbruck, Austria
Bergmeister, K.
BAUINGENIEUR,
2010,
85
: 159
-
168
←
1
2
3
4
5
→