Tunnelling in complex geological structures during the construction of the Brenner Base Tunnel

被引:0
|
作者
Marini, David [1 ]
Lussu, Andrea [2 ]
Hofmann, Matthias [2 ]
Venditti, Giuseppe [1 ]
机构
[1] Brenner Basistunnel BBT SE, Bahnhofstraße 1, Bolzano,39100, Italy
[2] Brenner Basistunnel BBT SE, Amraserstraße 8, Innsbruck,6020, Austria
来源
Geomechanik und Tunnelbau | 2024年 / 17卷 / 06期
关键词
D O I
10.1002/geot.202400054
中图分类号
学科分类号
摘要
引用
收藏
页码:594 / 604
相关论文
共 50 条
  • [1] Construction of the Brenner Base Tunnel
    Bergmeister, K.
    BAUINGENIEUR, 2010, 85 : 159 - 168
  • [2] The Brenner Base Tunnel – geological, construction and logistical challenges and innovations at half time
    Bergmeister, Konrad
    Geomechanik und Tunnelbau, 2019, 12 (05): : 555 - 563
  • [3] Brenner Base Tunnel – Tunnelling in the immediate vicinity of existing structures on the Tulfes–Pfons contract
    Mössmer S.
    Sulzbacher G.
    Jedlitschka G.
    Holzleitner W.
    Geomechanik und Tunnelbau, 2019, 12 (06): : 708 - 715
  • [4] THE BRENNER BASE TUNNEL: GEOLOGICAL ISSUES FROM THE EXPLORATORY TUNNEL TO THE FINAL DESIGN
    Gattinoni, Paola
    Scesi, Laura
    16TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE, SGEM 2016: SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, VOL I, 2016, : 1005 - 1012
  • [5] Geomechanical characterisation of fault rocks in tunnelling: The Brenner Base Tunnel (Northern Italy)
    Gattinoni, Paola
    Pizzarotti, Enrico Maria
    Scesi, Laura
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 51 : 250 - 257
  • [6] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (143): : 53 - 55
  • [7] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (144): : 73 - 75
  • [8] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2023, (148):
  • [9] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2023, (145): : 40 - 42
  • [10] Brenner Base Tunnel
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2021, (139): : 73 - 74