Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China

被引:25
|
作者
You, Yang [1 ]
Yan, Changhong [1 ]
Xu, Baotian [1 ]
Liu, Shi [2 ]
Che, Canhui [2 ]
机构
[1] Nanjing Univ, Sch Earth Sci & Engn, Nanjing 210046, Jiangsu, Peoples R China
[2] Anhui Hydrogeol & Engn Geol Corp, Nanjing Branch, Nanjing 210019, Jiangsu, Peoples R China
关键词
Deep foundation pit; Parameter calculation; Dewatering schemes; Numerical simulation; NUMERICAL-SIMULATION; CONFINED AQUIFER; SETTLEMENT; CONSTRUCTION; WALL;
D O I
10.1016/j.jrmge.2018.02.002
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper confined aquifer, where the pit bottom is located, should be 1 m below the pit bottom, while that of the lower confined aquifer should be dewatered down to a safe water level to avoid uplift problem. The Yangtze River levee is notably close to the pit, and its deformation caused by dewatering should be controlled. A pumping test was performed to obtain the hydraulic conductivity of the upper confined aquifer. The average value of the hydraulic conductivity obtained from analytical calculation is 20.45 m/d, which is larger than the values from numerical simulation (horizontal hydraulic conductivity K-H = 16 m/d and vertical hydraulic conductivity K-V = 8 m/d). The difference between K-H and K-V indicates the anisotropy of the aquifer. Two dewatering schemes were designed for the construction and simulated by the numerical models for comparison purposes. The results show that though the first scheme could meet the dewatering requirements, the largest accumulated settlement and differential settlement would be 94.64 mm and 3.3 parts per thousand, respectively, greatly exceeding the limited values. Meanwhile, the second scheme, in which the bottoms of the waterproof curtains in ramp B and the river side of ramp A are installed at a deeper elevation of -28 m above sea level, and 27 recharge wells are set along the levee, can control the deformation of the levee significantly. (C) 2018 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
引用
收藏
页码:555 / 566
页数:12
相关论文
共 50 条
  • [31] Research on Subsidence Induced by the Dewatering-Curtain Interaction in the Deep Foundation Pit of the Shield Launching Shaft in Shenzhen, China
    Zhang, Xingsheng
    Hu, Mengke
    Chen, Xing
    Dong, Jinyu
    Liu, Shipeng
    WATER, 2023, 15 (09)
  • [32] Optimization methods of retaining structure in deep foundation pit
    Xiao Wu-quan
    Leng Wu-ming
    ROCK AND SOIL MECHANICS, 2007, 28 (06) : 1201 - 1204
  • [33] Optimization methods of retaining structure in deep foundation pit
    Xiao, Wu-Quan
    Leng, Wu-Ming
    Yantu Lixue/Rock and Soil Mechanics, 2007, 28 (06): : 1201 - 1204
  • [34] Deformation of the deep foundation pit under the excavation on the island of a river
    Wang, Wei
    Bian, Jiasheng
    Wu, Rongbing
    He, Bo
    Electronic Journal of Geotechnical Engineering, 2015, 20 (05): : 1657 - 1665
  • [35] Research on Application of Deep Foundation Pit Decompression Dewatering Technology and Impact on Surrounding Environment
    Dong Dong Zhang
    Jun Wen Ding
    Rong Biao Wang
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 101 - +
  • [36] Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions
    Jianxiu Wang
    Xiaotian Liu
    Jiaxing Liu
    Linbo Wu
    Qingfeng Guo
    Qian Yang
    KSCE Journal of Civil Engineering, 2018, 22 : 2784 - 2801
  • [37] Dewatering forecast of deep foundation pit considering waterproof curtain using analytic approach
    Gao Xu
    Guo Jian-bo
    Yan E-chuan
    ROCK AND SOIL MECHANICS, 2018, 39 (04) : 1431 - 1439
  • [38] Numerical evaluation of a 70-m deep hydropower station foundation pit dewatering
    Jianxiu Wang
    Yansheng Deng
    Xiaobo Wang
    Xiaotian Liu
    Nianqing Zhou
    Environmental Earth Sciences, 2022, 81
  • [39] Numerical evaluation of a 70-m deep hydropower station foundation pit dewatering
    Wang, Jianxiu
    Deng, Yansheng
    Wang, Xiaobo
    Liu, Xiaotian
    Zhou, Nianqing
    ENVIRONMENTAL EARTH SCIENCES, 2022, 81 (14)
  • [40] Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions
    Wang, Jianxiu
    Liu, Xiaotian
    Liu, Jiaxing
    Wu, Linbo
    Guo, Qingfeng
    Yang, Qian
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2784 - 2801