Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions

被引:23
|
作者
Wang, Jianxiu [1 ,2 ,3 ]
Liu, Xiaotian [1 ]
Liu, Jiaxing [1 ]
Wu, Linbo [1 ]
Guo, Qingfeng [1 ]
Yang, Qian [4 ]
机构
[1] Tongji Univ, Coll Civil Engn, Shanghai 200092, Peoples R China
[2] China Univ Min & Technol, State Key Lab Geo Mech & Deep Underground Engn, Xuzhou 221008, Jiangsu, Peoples R China
[3] Tongji Univ, Key Lab Geotech & Underground Engn, Minist Educ, Shanghai 200092, Peoples R China
[4] China MCC20 Grp Co Ltd, Shanghai 201900, Peoples R China
基金
中国国家自然科学基金;
关键词
multi-aquifer and multi-aquitard; foundation pit dewatering; water inrush; field experiment; numerical simulation; PIPING EROSION; CONFINED AQUIFER; SOILS; WATER; SIMULATION; QUICKSAND; WELLS; FLOW;
D O I
10.1007/s12205-017-1950-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A 2,250 mm whirlpool foundation pit is located in Donghai Island, Zhanjiang City, Guangdong Province, China. The layers of the island are composed of multi-aquifers and multi-aquitards (MAMA). The aquifers are intersected by partial aquitard lenses. A large confined aquifer is frequently interbedded and separated into several sub-confined aquifers by partial aquitards. In the 2,250 mm foundation pit, the water level of two confined aquifers was reduced to satisfy excavation requirements and prevent water inrush. Construction of the 32.55 m deep foundation pit encountered MAMA and potential defects of the diaphragm wall. The pumping wells in the second confined aquifer were used to reduce the water level to ensure the safety of bottom excavation. The pumping wells in the first confined aquifer were used to reduce the water level under emergency conditions to prevent potential water inrush and piping from the defects of the diaphragm wall. Field pumping tests and numerical simulations were performed to determine the risk of leakage and verify the capability of the pumping wells to reduce the water level. Quicksand occurred during shallow excavation because of leakage although the confined aquifer had been cut off and pumped for a long time. Three pumping wells were installed to reduce the water level. When the foundation pit was excavated to a depth of 24 m, water inrush occurred at the middle of the pit bottom although the water level of the dewatered aquifer had been reduced to below the excavation face. A 90 m deep borehole was found where the underlying confined aquifer below the first aquifer induced the water inrush. Although the upper water level was reduced, the high water level in the deep part still induced water inrush. The pumping wells in the second aquifer were all opened, and the water level of the underlying confined aquifer was reduced. After the water level was reduced to below the pit bottom, the borehole was filled, and the water inrush stopped. However, water inrush occurred on the cracks of the diaphragm wall as predicted. The pre-installed pumping wells were opened to control the water inrush. The deepest foundation pit on the island was constructed successfully after dealing with the water inrush and leakages.
引用
收藏
页码:2784 / 2801
页数:18
相关论文
共 50 条
  • [1] Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions
    Jianxiu Wang
    Xiaotian Liu
    Jiaxing Liu
    Linbo Wu
    Qingfeng Guo
    Qian Yang
    KSCE Journal of Civil Engineering, 2018, 22 : 2784 - 2801
  • [2] Optimization schemes for deep foundation pit dewatering under complicated hydrogeological conditions using MODFLOW-USG
    Chen, Zhou
    Huang, Jintao
    Zhan, Hongbin
    Wang, Jinguo
    Dou, Zhi
    Zhang, Chuanjian
    Chen, Changsheng
    Fu, Yesheng
    ENGINEERING GEOLOGY, 2022, 303
  • [3] Dewatering and monitoring analysis of a deep foundation pit in Lanzhou
    Li, Yuan-Xun, 1600, Chinese Society of Civil Engineering (36):
  • [4] Project Design of Dewatering for Deep Foundation Pit in Dalian
    Guo, Bailiang
    Liu, Hongbin
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 440 - 444
  • [5] Numerical study of dewatering in a large deep foundation pit
    Wang, Jianxiu
    Feng, Bo
    Yu, Haipeng
    Guo, Taiping
    Yang, Guangyun
    Tang, Junwu
    ENVIRONMENTAL EARTH SCIENCES, 2013, 69 (03) : 863 - 872
  • [6] Numerical study of dewatering in a large deep foundation pit
    Jianxiu Wang
    Bo Feng
    Haipeng Yu
    Taiping Guo
    Guangyun Yang
    Junwu Tang
    Environmental Earth Sciences, 2013, 69 : 863 - 872
  • [7] Numerical evaluation of a 70-m deep hydropower station foundation pit dewatering
    Jianxiu Wang
    Yansheng Deng
    Xiaobo Wang
    Xiaotian Liu
    Nianqing Zhou
    Environmental Earth Sciences, 2022, 81
  • [8] Numerical evaluation of a 70-m deep hydropower station foundation pit dewatering
    Wang, Jianxiu
    Deng, Yansheng
    Wang, Xiaobo
    Liu, Xiaotian
    Zhou, Nianqing
    ENVIRONMENTAL EARTH SCIENCES, 2022, 81 (14)
  • [9] Treatment of Leakage Disease of a Deep Foundation Pit
    Liu, Hui
    Zhang, Xinjie
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, 2022, : 195 - 208
  • [10] Affect of Large Deep Foundation pit dewatering on the Neighboring Buildings
    Ding, Kewei
    Zhao, Fan
    Zhang, Xiaozhi
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 24 - 27