Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China

被引:25
|
作者
You, Yang [1 ]
Yan, Changhong [1 ]
Xu, Baotian [1 ]
Liu, Shi [2 ]
Che, Canhui [2 ]
机构
[1] Nanjing Univ, Sch Earth Sci & Engn, Nanjing 210046, Jiangsu, Peoples R China
[2] Anhui Hydrogeol & Engn Geol Corp, Nanjing Branch, Nanjing 210019, Jiangsu, Peoples R China
关键词
Deep foundation pit; Parameter calculation; Dewatering schemes; Numerical simulation; NUMERICAL-SIMULATION; CONFINED AQUIFER; SETTLEMENT; CONSTRUCTION; WALL;
D O I
10.1016/j.jrmge.2018.02.002
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper confined aquifer, where the pit bottom is located, should be 1 m below the pit bottom, while that of the lower confined aquifer should be dewatered down to a safe water level to avoid uplift problem. The Yangtze River levee is notably close to the pit, and its deformation caused by dewatering should be controlled. A pumping test was performed to obtain the hydraulic conductivity of the upper confined aquifer. The average value of the hydraulic conductivity obtained from analytical calculation is 20.45 m/d, which is larger than the values from numerical simulation (horizontal hydraulic conductivity K-H = 16 m/d and vertical hydraulic conductivity K-V = 8 m/d). The difference between K-H and K-V indicates the anisotropy of the aquifer. Two dewatering schemes were designed for the construction and simulated by the numerical models for comparison purposes. The results show that though the first scheme could meet the dewatering requirements, the largest accumulated settlement and differential settlement would be 94.64 mm and 3.3 parts per thousand, respectively, greatly exceeding the limited values. Meanwhile, the second scheme, in which the bottoms of the waterproof curtains in ramp B and the river side of ramp A are installed at a deeper elevation of -28 m above sea level, and 27 recharge wells are set along the levee, can control the deformation of the levee significantly. (C) 2018 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
引用
收藏
页码:555 / 566
页数:12
相关论文
共 50 条
  • [21] Study of deep foundation pit dewatering and land-subsidence control
    Luo, Zujiang
    Zhang, Yueping
    Liu, Jinbao
    Shenyang Jianzhu Daxue Xuebao (Ziran Kexue Ban)/Journal of Shenyang Jianzhu University (Natural Science), 2007, 23 (01): : 47 - 51
  • [22] Development and application of an integrated system of dewatering and recharge for the deep foundation pit
    Zhenjie Zhang
    Chunpin Zeng
    Enzhong Zhang
    Qingwei Su
    Min Li
    Liang Gong
    Fuqiang Geng
    Zhigang Zhang
    Applied Water Science, 2024, 14
  • [23] Numerical evaluation of land subsidence induced by dewatering in deep foundation pit
    Zhang D.-D.
    Song C.-Y.
    Chen L.-Z.
    Journal of Shanghai Jiaotong University (Science), 2013, 18 (3) : 278 - 283
  • [24] Research on the Deep Foundation Pit and Dewatering Design of Chanhe Subway Station
    Wang, Shenxia
    Journal of Railway Engineering Society, 2020, 37 (08) : 11 - 14
  • [25] Optimization of supporting schemes for deep foundation pit based on fuzzy grey relation projection method
    Wei Xin-jiang
    Yu Yin
    Zhang Shi-min
    ROCK AND SOIL MECHANICS, 2011, 32 : 438 - 444
  • [26] Design of Dewatering Scheme for Deep Foundation Pit with a Multi-Objective Optimization Approach Based on Cost Controlment
    Dong, Zhigao
    Xie, Mingze
    Chai, Chunyang
    Huo, Xiushi
    Huang, Yong
    WATER, 2025, 17 (06)
  • [27] 3-Dcoupling Numerical Model of Deep Foundation Pit Dewatering Engineering
    Li Yuhua
    Xie Liangwei
    Xiang Lirong
    2010 INTERNATIONAL SYMPOSIUM ON MULTI-FIELD COUPLING THEORY OF ROCK AND SOIL MEDIA AND ITS APPLICATIONS, 2010, : 789 - 793
  • [28] Coupled Numerical Simulation Research on Dewatering and Land Subsidence in Deep Foundation Pit
    Dong Dong Zhang
    APPLIED MECHANICS AND MATERIALS I, PTS 1-3, 2013, 275-277 : 1549 - 1552
  • [29] On atypical affection on environment due to dewatering of foundation pit in developed river system area
    Li, Dan
    Li, Nianfeng
    Tang, Bin
    Gong, Jianwu
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 710 - +
  • [30] An optimization model of grey matter element analysis of supporting schemes for deep foundation pit and its application
    Feng Yu-guo
    Wang Wei-ming
    ROCK AND SOIL MECHANICS, 2009, 30 (08) : 2467 - 2470