Integrated Waterway Scheduling, Berth Allocation and Quay Crane Assignment Problem by Using a Hybrid Flow Shop Concept

被引:0
|
作者
Tavakkoli-Moghaddam, Reza [1 ]
Fatemi-Anaraki, Soroush [1 ]
Abdolhamidi, Dorsa [1 ]
Vahedi-Nouri, Behdin [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
waterway scheduling; berth allocation; quay crane assignment problem; hybrid flow shop scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Port operators mainly deal with three scheduling problems, namely waterway scheduling, berth allocation and quay crane assignment problem. Providing an efficient schedule in these areas for ships will decrease their waiting time at ports, which in turn enhances port's competitiveness. Trying to do so, there are technical limitations at ports, including draft limit of ships, tidal impacts on water level, adaptability of infrastructure and shape of wharfs with incoming vessels and total number of available quay cranes, which are needed to be considered. In addition, in this research, vessels are not required to arrive at the port area at the beginning of the planning horizon. Furthermore, a safety distance between vessels moving in the same direction is needed to be shed light on in order to avoid collision. Since the above stages are closely related together, solving them separately may yield sub-optimal solutions. Therefore, in this research, a mixed-integer programming model is presented to solve three mentioned problems in an integrated way. It is worth mentioning that the aforementioned stages are similar to a hybrid flow shop problem with unrelated parallel machines under a machine eligibility constraint. Consequently, this approach is adopted for modeling the problem.
引用
收藏
页码:243 / 247
页数:5
相关论文
共 50 条
  • [41] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [42] Integrated planning of berth allocation, quay crane assignment and yard assignment in multiple cooperative terminals
    Guo, Liming
    Zheng, Jianfeng
    Du, Jian
    Gao, Ziyou
    Fagerholt, Kjetil
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 183
  • [43] Multiobjective hybrid genetic algorithm for quay crane scheduling in berth allocation planning
    Liang, Chengji
    Lin, Lin
    Jo, Jungbok
    International Journal of Manufacturing Technology and Management, 2009, 16 (1-2) : 127 - 146
  • [44] Development of Integrated Model For Continuous Berth Allocation Problem and Quay Crane Scheduling With Non Crossing Constraint
    Basri, Azyanzuhaila Hasan
    Zainuddin, Zaitul Marlizawati
    STATISTICS AND OPERATIONAL RESEARCH INTERNATIONAL CONFERENCE (SORIC 2013), 2014, 1613 : 113 - 121
  • [45] A genetic algorithm for robust berth allocation and quay crane assignment
    Rodriguez-Molins M.
    Ingolotti L.
    Barber F.
    Salido M.A.
    Sierra M.R.
    Puente J.
    Progress in Artificial Intelligence, 2014, 2 (4) : 177 - 192
  • [46] Improved formulations and an Adaptive Large Neighborhood Search heuristic for the integrated berth allocation and quay crane assignment problem
    Iris, Cagatay
    Pacino, Dario
    Ropke, Stefan
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 105 : 123 - 147
  • [47] An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal
    Yang, Chunxia
    Wang, Xiaojun
    Li, Zhenfeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 243 - 253
  • [48] Discretization-Strategy-Based Solution for Berth Allocation and Quay Crane Assignment Problem
    Tang, Min
    Ji, Bin
    Fang, Xiaoping
    Yu, Samson S.
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (04)
  • [49] Effect of Service Priority on the Integrated Continuous Berth Allocation and Quay Crane Assignment Problem after Port Congestion
    Tang, Shuang
    Xu, Sudong
    Gao, Jianwen
    Ma, Mengdi
    Liao, Peng
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (09)
  • [50] An Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price
    Msakni, Mohamed Kais
    Al-Salem, Mohammed
    Diabat, Ali
    Rabadi, Ghaith
    Kotachi, Mariam
    2016 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE & COMPUTATIONAL INTELLIGENCE (CSCI), 2016, : 1286 - 1291