Integrated Waterway Scheduling, Berth Allocation and Quay Crane Assignment Problem by Using a Hybrid Flow Shop Concept

被引:0
|
作者
Tavakkoli-Moghaddam, Reza [1 ]
Fatemi-Anaraki, Soroush [1 ]
Abdolhamidi, Dorsa [1 ]
Vahedi-Nouri, Behdin [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
waterway scheduling; berth allocation; quay crane assignment problem; hybrid flow shop scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Port operators mainly deal with three scheduling problems, namely waterway scheduling, berth allocation and quay crane assignment problem. Providing an efficient schedule in these areas for ships will decrease their waiting time at ports, which in turn enhances port's competitiveness. Trying to do so, there are technical limitations at ports, including draft limit of ships, tidal impacts on water level, adaptability of infrastructure and shape of wharfs with incoming vessels and total number of available quay cranes, which are needed to be considered. In addition, in this research, vessels are not required to arrive at the port area at the beginning of the planning horizon. Furthermore, a safety distance between vessels moving in the same direction is needed to be shed light on in order to avoid collision. Since the above stages are closely related together, solving them separately may yield sub-optimal solutions. Therefore, in this research, a mixed-integer programming model is presented to solve three mentioned problems in an integrated way. It is worth mentioning that the aforementioned stages are similar to a hybrid flow shop problem with unrelated parallel machines under a machine eligibility constraint. Consequently, this approach is adopted for modeling the problem.
引用
收藏
页码:243 / 247
页数:5
相关论文
共 50 条
  • [31] An Exact Algorithm for the Integrated Planning of Berth Allocation and Quay Crane Assignment
    Vacca, Ilaria
    Salani, Matteo
    Bierlaire, Michel
    TRANSPORTATION SCIENCE, 2013, 47 (02) : 148 - 161
  • [32] The Integrated Multi-quay Berth Allocation and Crane Assignment Problem: Formulation and Case Study
    Krimi, Issam
    Benmansour, Rachid
    el Cadi, Abdessamad Ait
    Duvivier, David
    Elhachemi, Nizar
    Deshayes, Laurent
    Ouarrasse, Amine Ait
    2018 7TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2018), 2018, : 157 - 161
  • [33] Integrated Berth Allocation and Quay Crane Assignment Problem: Set partitioning models and computational results
    Iris, Cagatay
    Pacino, Dario
    Ropke, Stefan
    Larsen, Allan
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 81 : 75 - 97
  • [34] Berth Allocation and Quay Crane Assignment Under Uncertainties
    Tan, Caimao
    He, Junliang
    Wang, Yuancai
    TRANSDISCIPLINARY ENGINEERING FOR COMPLEX SOCIO-TECHNICAL SYSTEMS - REAL-LIFE APPLICATIONS, 2020, 12 : 263 - 270
  • [35] Integrated continuous berth allocation and quay crane assignment and scheduling problem with time-dependent physical constraints in container terminals
    Malekahmadi, Amirsalar
    Alinaghian, Mehdi
    Hejazi, Seyed Reza
    Saidipour, Mohammad Ali Assl
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 147
  • [36] A Genetic Algorithm for Berth Allocation and Quay Crane Assignment
    Rodriguez-Molins, Mario
    Barber, Federico
    Sierra, Maria R.
    Puente, Jorge
    Salido, Miguel A.
    ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2012, 2012, 7637 : 601 - 610
  • [37] Optimizing integrated berth allocation and quay crane assignment: A distributionally robust approach
    Wang, Chong
    Wang, Qi
    Xiang, Xi
    Zhang, Canrong
    Miao, Lixin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 320 (03) : 593 - 615
  • [38] The simultaneous berth and quay crane allocation problem
    Imai, Akio
    Chen, Hsieh Chia
    Nishimura, Etsuko
    Papadimitriou, Stratos
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (05) : 900 - 920
  • [39] Distributionally robust chance-constrained optimization for the integrated berth allocation and quay crane assignment problem
    Wang, Chong
    Liu, Kaiyuan
    Zhang, Canrong
    Miao, Lixin
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2024, 182
  • [40] Functional integration approach for the berth allocation, quay crane assignment and specific quay crane assignment problems
    Karam, A.
    Eltawil, A. B.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 458 - 466