Integrated Waterway Scheduling, Berth Allocation and Quay Crane Assignment Problem by Using a Hybrid Flow Shop Concept

被引:0
|
作者
Tavakkoli-Moghaddam, Reza [1 ]
Fatemi-Anaraki, Soroush [1 ]
Abdolhamidi, Dorsa [1 ]
Vahedi-Nouri, Behdin [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
waterway scheduling; berth allocation; quay crane assignment problem; hybrid flow shop scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Port operators mainly deal with three scheduling problems, namely waterway scheduling, berth allocation and quay crane assignment problem. Providing an efficient schedule in these areas for ships will decrease their waiting time at ports, which in turn enhances port's competitiveness. Trying to do so, there are technical limitations at ports, including draft limit of ships, tidal impacts on water level, adaptability of infrastructure and shape of wharfs with incoming vessels and total number of available quay cranes, which are needed to be considered. In addition, in this research, vessels are not required to arrive at the port area at the beginning of the planning horizon. Furthermore, a safety distance between vessels moving in the same direction is needed to be shed light on in order to avoid collision. Since the above stages are closely related together, solving them separately may yield sub-optimal solutions. Therefore, in this research, a mixed-integer programming model is presented to solve three mentioned problems in an integrated way. It is worth mentioning that the aforementioned stages are similar to a hybrid flow shop problem with unrelated parallel machines under a machine eligibility constraint. Consequently, this approach is adopted for modeling the problem.
引用
收藏
页码:243 / 247
页数:5
相关论文
共 50 条
  • [21] The berth allocation and quay crane assignment problem with crane travel and setup times
    Correcher, Juan F.
    Perea, Federico
    Alvarez-Valdes, Ramon
    COMPUTERS & OPERATIONS RESEARCH, 2024, 162
  • [22] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [23] A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem
    Idris, Nurhidayu
    Zainuddin, Zaitul Marlizawati
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [24] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [25] An Integrated Quay Crane Assignment and Scheduling Problem
    Diabat, Ali
    Theodorou, Effrosyni
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 : 115 - 123
  • [26] Integrated berth allocation and quay crane assignment with uncertain maintenance activities
    Li, Ying
    Chu, Feng
    Zheng, Feifeng
    Kacem, Imed
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 248 - 253
  • [27] A quay crane assignment approach for berth allocation problem in container terminal
    Hu, Zhi-Hua
    2010 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY AND SECURITY INFORMATICS (IITSI 2010), 2010, : 17 - 21
  • [28] The improved AFSA algorithm for the berth allocation and quay crane assignment problem
    Liu, Yi
    Wang, Jian
    Shahbazzade, Sabina
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2019, 22 (02): : S3665 - S3672
  • [29] A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning
    Liang, Chengji
    Huang, Youfang
    Yang, Yang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) : 1021 - 1028
  • [30] The improved AFSA algorithm for the berth allocation and quay crane assignment problem
    Yi Liu
    Jian Wang
    Sabina Shahbazzade
    Cluster Computing, 2019, 22 : 3665 - 3672