共 50 条
- [32] Designing a new spillway for the Rassisse Dam LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 169 - 176
- [34] Infrastructure: Calaveras Dam spillway completed Civil Engineering Magazine Archive, 2016, 86 (7-8): : 26 - 28
- [36] The calculation of the dynamic characteristics of the spillway of the dam Magazine of Civil Engineering, 2022, 113 (05):