共 50 条
- [1] New spillway for Ulley dam International Water Power and Dam Construction, 2010, 62 (10): : 26 - 28
- [2] Designing a new spillway for the Rassisse Dam LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 169 - 176
- [3] New spillway extends life of Chambon dam International Water Power and Dam Construction, 1994, 46 (02):
- [5] Physical modeling of the new spillway of Gage II Dam HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2013, (02): : 31 - 38
- [6] Seismic stability of new exchequer dam and gated spillway structure DAM O&M ISSUES - THE CHALLENGE OF THE 21ST CENTURY, 2000, : 437 - 458
- [7] Coupled spillway devices and energy dissipation system at St-Marc Dam (France) LABYRINTH AND PIANO KEY WEIRS - PKW 2011, 2011, : 113 - 121
- [8] DAMAGE TO KARNAFULI DAM SPILLWAY JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1974, 100 (NHY1): : 236 - 238
- [9] Friant Dam spillway rehabilitation ENERGY AND WATER: SUSTAINABLE DEVELOPMENT - PROCEEDINGS OF THEME D: WATER FOR A CHANGING GLOBAL COMMUNITY, 1997, : 30 - 35
- [10] Ochoco Dam spillway modification ENERGY AND WATER: SUSTAINABLE DEVELOPMENT - PROCEEDINGS OF THEME D: WATER FOR A CHANGING GLOBAL COMMUNITY, 1997, : 36 - 41