共 50 条
- [41] DESIGN OF SPILLWAY GATES OF IWAYA DAM. Doboku Gakkai-shi/Journal of the Japan Society of Civil Engineers, 1977, 62 (02): : 17 - 24
- [42] Numerical Detection of Cavitation Damage on Dam Spillway CIVIL ENGINEERING JOURNAL-TEHRAN, 2016, 2 (09): : 484 - 490
- [44] NUMERICAL MODELING OF FLOW OVER A DAM SPILLWAY PROCEEDINGS OF THE ASME FLUIDS ENGINEERING DIVISION SUMMER CONFERENCE, VOL 1, PTS A AND B, 2006, : 343 - 349
- [45] Dam Instability Risk Analysis of Damaged Spillway ENGINEERING JOURNAL-THAILAND, 2013, 17 (04): : 1 - 7
- [46] Investigation of the Gold Creek dam spillway, Australia Research Report Series - University of Queensland, Department of Civil Engineering, 1996, (CE153):
- [48] Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway LABYRINTH AND PIANO KEY WEIRS - PKW 2011, 2011, : 233 - 240
- [50] Spillway capacity upgrade at Malarce dam: Construction of an additional piano key weir spillway LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 243 - 252