Review of hydrology and spillway capacity of Simly Dam project

被引:0
|
作者
Izhar-ul-Haq
Zia-ul-Hassan
Abbas, ST
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Simly Dam was built to supply drinking water to Islamabad, the Capital of Pakistan. During construction of the project, flood higher than the design flood was experienced. The hydrological data and design of existing spillway for safe passing of revised PMF was reviewed. the spillway capacity was found inadequate. It was decided to construct an auxiliary spillway on the saddle. Later on gates were installed on the existing service spillway to enhance the water supply from 24 MGD to 42 MGD. This paper describes the studies carried out to review the hydrology and spillway capacity of the project.
引用
收藏
页码:68 / 73
页数:6
相关论文
共 50 条
  • [41] Dam safety policy for spillway design floods
    Dubler, JR
    Grigg, NS
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 1996, 122 (04) : 163 - 169
  • [42] Maintenance of a spillway and dam foundation suspected of piping
    Oskoorouchi, AM
    Lane, PJ
    Hermann, DF
    DAM O&M ISSUES - THE CHALLENGE OF THE 21ST CENTURY, 2000, : 733 - 758
  • [43] CRACK CONTROL FOR SPILLWAY CHUTE AT RIRIE DAM
    KADEN, RA
    SCHRADER, EK
    JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1980, 77 (04): : 293 - 293
  • [44] Folsom Dam spillway stilling basin repair
    Muller, BC
    Einhellig, RF
    WATER RESOURCES ENGINEERING 98, VOLS 1 AND 2, 1998, : 1511 - 1516
  • [45] NUMERICAL ANALYSIS OF KIELDER DAM SPILLWAY.
    Ellis, J.
    Journal of the Institution of Water Engineers and Scientists, 1985, 39 (03): : 254 - 270
  • [46] Stabilizing the spillway section foundation at Pueblo Dam
    Scott, GA
    Trojanowski, J
    H2GEO: GEOTECHNICAL ENGINEERING FOR WATER RESOURCES, 2005, (02): : 55 - 65
  • [47] Cost-effective private dam safety assurance policy and spillway design/review
    Pisaniello, John D.
    McKay, Jennifer M.
    International Journal of Water Resources Development, 1999, 15 (03): : 261 - 276
  • [48] Hydraulic design of Nakasujigawa dam stepped spillway
    Hakoishi, N
    Sumi, T
    HYDRAULICS OF STEPPED SPILLWAYS, 2000, : 27 - 34
  • [49] A dam equipped with labyrinth spillway in the Sultanate of Oman
    Bazerque, L.
    Agresti, P.
    Guilbaud, C.
    Al Harty, S.
    Strobl, Theodor
    LABYRINTH AND PIANO KEY WEIRS - PKW 2011, 2011, : 251 - 259
  • [50] Application of the Upwind Scheme to the Flow of Dam Spillway
    Kim, Won
    PROCEEDINGS OF THE 2ND INTERNATIONAL YELLOW RIVER FORUM ON KEEPING HEALTHY LIFE OF THE RIVER, VOL III, 2005, : 168 - 173