On the optimal management of project risk

被引:50
|
作者
Tavares, LV [1 ]
Ferreira, JAA [1 ]
Coelho, JS [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Inst Super Tecn, P-1000 Lisbon, Portugal
关键词
project management; scheduling; risk analysis; finance;
D O I
10.1016/S0377-2217(97)00344-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The uncertainty of project networks has been mainly considered as the randomness of duration of the activities. However, another major problem for project managers is the uncertainty due to the randomness of the amount of resources required by each activity which can be expressed by the randomness of its cost. Such randomness can seriously affect the discounted cost of the project and it may be strongly correlated with the duration of the activity. In this paper, a model considering the randomness of both the cost and the duration of each activity is introduced and the problem of project scheduling is studied in terms of the project's discounted cost and of the risk of not meeting its completion time. The adoption of the earliest (latest) starting time for each activity decreases (increases) the risk of delays but increases (decreases) the discounted cost of the project. Therefore, an optimal compromise has to be achieved. This problem of optimization is studied in terms of the probability of the duration and of the discounted cost of the project falling outside the acceptable domain (Risk function) using the concept of float factor as major decision variable. This last concept is proposed to help the manager to synthetize the large number of the decision variables representing each schedule for the studied project. Numerical results are also presented for a specific project network. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:451 / 469
页数:19
相关论文
共 50 条
  • [41] Project Risk Management for Digital Manufacturing
    Muncinelli, Gianfranco
    De Lima, Edson Pinheiro
    Gouvea Da Costa, Sergio E.
    Deschamps, Fernando
    TRANSDISCIPLINARY ENGINEERING METHODS FOR SOCIAL INNOVATION OF INDUSTRY 4.0, 2018, 7 : 135 - 144
  • [42] Framework of the project risk management system
    Fu Zhimin
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 328 - 335
  • [43] THE RISK AS A ECONOMICS AND PROJECT MANAGEMENT PHENOMENON
    Radovic, Dragan
    MONTENEGRIN JOURNAL OF ECONOMICS, 2009, 5 (09) : 143 - 150
  • [44] Risk Management of Information System Project
    Liu, Haibin
    Li, Fei
    Li, Wenqiong
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2826 - 2829
  • [45] The advantage of project risk management tools
    Ghaeli, Mohammad Reza
    JOURNAL OF PROJECT MANAGEMENT, 2018, 3 (02) : 121 - 124
  • [46] Risk management in the conceptual phase of a project
    Uher, Thomas E.
    Toakley, A.Ray
    International Journal of Project Management, 1999, 17 (03): : 161 - 169
  • [47] On Integrating Risk Perspectives in Project Management
    M Sandøy
    T Aven
    D Ford
    Risk Management, 2005, 7 (4) : 7 - 21
  • [48] PROJECT RISK MANAGEMENT IN GLOBAL ENVIRONMENT
    Masar, Matej
    Hudakova, Maria
    Luskova, Maria
    GLOBALIZATION AND ITS SOCIO-ECONOMIC CONSEQUENCES, 2018, : 707 - 714
  • [49] Engineering Project Risk Management in China
    Ren, Jie
    2016 INTERNATIONAL CONFERENCE ON MECHANICAL MANUFACTURING AND ENERGY ENGINEERING (ICMMEE 2016), 2016, : 17 - 20
  • [50] PROJECT MANAGEMENT FOR AN EARTHQUAKE RISK RESPONSE
    Popa, Virgil
    Tanasescu, Dorina