On the optimal management of project risk

被引:50
|
作者
Tavares, LV [1 ]
Ferreira, JAA [1 ]
Coelho, JS [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Inst Super Tecn, P-1000 Lisbon, Portugal
关键词
project management; scheduling; risk analysis; finance;
D O I
10.1016/S0377-2217(97)00344-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The uncertainty of project networks has been mainly considered as the randomness of duration of the activities. However, another major problem for project managers is the uncertainty due to the randomness of the amount of resources required by each activity which can be expressed by the randomness of its cost. Such randomness can seriously affect the discounted cost of the project and it may be strongly correlated with the duration of the activity. In this paper, a model considering the randomness of both the cost and the duration of each activity is introduced and the problem of project scheduling is studied in terms of the project's discounted cost and of the risk of not meeting its completion time. The adoption of the earliest (latest) starting time for each activity decreases (increases) the risk of delays but increases (decreases) the discounted cost of the project. Therefore, an optimal compromise has to be achieved. This problem of optimization is studied in terms of the probability of the duration and of the discounted cost of the project falling outside the acceptable domain (Risk function) using the concept of float factor as major decision variable. This last concept is proposed to help the manager to synthetize the large number of the decision variables representing each schedule for the studied project. Numerical results are also presented for a specific project network. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:451 / 469
页数:19
相关论文
共 50 条
  • [31] Optimal project organizational structure for construction management
    Cheng, MY
    Su, CW
    You, HY
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (01): : 70 - 79
  • [32] It project risk factors: The project management professionals perspective
    Xavier University, Cincinnati, OH 45207-5161, United States
    J. Comput. Inf. Syst., 2007, 4 (61-69):
  • [33] IT project risk factors: The project management professionals perspective
    Tesch, Debbie
    Kloppenborg, Timothy J.
    Frolick, Mark N.
    JOURNAL OF COMPUTER INFORMATION SYSTEMS, 2007, 47 (04) : 61 - 69
  • [34] CONDITION OF ACCEPTABILITY OF PROJECT RISK IN MANAGEMENT OF THE PROJECT PORTFOLIO
    Kral, Pavol
    Janoskova, Katarina
    GLOBALIZATION AND ITS SOCIO-ECONOMIC CONSEQUENCES, PTS I AND II, 2015, : 345 - +
  • [35] Renewable energy project: Project management, challenges and risk
    Goh, H. H.
    Lee, S. W.
    Chua, Q. S.
    Goh, K. C.
    Kok, B. C.
    Teo, K. T. K.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2014, 38 : 917 - 932
  • [36] The optimal risk management framework
    Marks, Larry
    ISACA Journal, 2019, 1 : 40 - 45
  • [37] Optimal Annuity Risk Management
    Koijen, Ralph S. J.
    Nijman, Theo E.
    Werker, Bas J. M.
    REVIEW OF FINANCE, 2011, 15 (04) : 799 - 833
  • [38] Risk Management in Project Portfolios Is More Than Managing Project Risks: A Contingency Perspective on Risk Management
    Teller, Juliane
    Kock, Alexander
    Gemuenden, Hans Georg
    PROJECT MANAGEMENT JOURNAL, 2014, 45 (04) : 67 - 80
  • [39] Risk Management in Highway Construction Project Based on Integrated Project Management System
    Jing Bingyin
    Jing Chunju
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
  • [40] The Research of Risk Management in Project Contracts
    Zhu, Rongjie
    Peng, Ying
    Sun, Yang
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2546 - 2549