On the optimal management of project risk

被引:50
|
作者
Tavares, LV [1 ]
Ferreira, JAA [1 ]
Coelho, JS [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Inst Super Tecn, P-1000 Lisbon, Portugal
关键词
project management; scheduling; risk analysis; finance;
D O I
10.1016/S0377-2217(97)00344-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The uncertainty of project networks has been mainly considered as the randomness of duration of the activities. However, another major problem for project managers is the uncertainty due to the randomness of the amount of resources required by each activity which can be expressed by the randomness of its cost. Such randomness can seriously affect the discounted cost of the project and it may be strongly correlated with the duration of the activity. In this paper, a model considering the randomness of both the cost and the duration of each activity is introduced and the problem of project scheduling is studied in terms of the project's discounted cost and of the risk of not meeting its completion time. The adoption of the earliest (latest) starting time for each activity decreases (increases) the risk of delays but increases (decreases) the discounted cost of the project. Therefore, an optimal compromise has to be achieved. This problem of optimization is studied in terms of the probability of the duration and of the discounted cost of the project falling outside the acceptable domain (Risk function) using the concept of float factor as major decision variable. This last concept is proposed to help the manager to synthetize the large number of the decision variables representing each schedule for the studied project. Numerical results are also presented for a specific project network. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:451 / 469
页数:19
相关论文
共 50 条
  • [21] Management of project risk reserves
    Karlsen, JT
    Lereim, J
    Managing in a Dangerous World: TWENTY-FIVE YEARS OF TECHNICAL CONFERENCES: BRIDGING BETWEEN TECHNOLOGY AND MANAGEMENT, 2004, : 179 - 186
  • [22] Project risk management [8]
    Richardson, Geoff
    Engineers Australia, 2005, 77 (02):
  • [23] Engineering project risk management
    Steed, John C.
    Engineering Management Journal, 2000, 10 (01): : 43 - 44
  • [24] Interface risk management modeling in complex project risk management
    Zhu, QC
    Chen, YW
    Yan, H
    ISMOT'04: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY: MANAGING TOTAL INNOVATION IN THE 21ST CENTURY, 2004, : 81 - 85
  • [25] Risk management in traditional and agile project management
    Buganova, Katarina
    Simickova, Jana
    13TH INTERNATIONAL SCIENTIFIC CONFERENCE ON SUSTAINABLE, MODERN AND SAFE TRANSPORT (TRANSCOM 2019), 2019, 40 : 986 - 993
  • [26] RISK MANAGEMENT ANALYSIS IN THE CONTEXT OF PROJECT MANAGEMENT
    Uzulans, Juris
    CURRENT ISSUES IN MANAGEMENT OF BUSINESS AND SOCIETY DEVELOPMENT - 2009, 2011, : 126 - 132
  • [27] The Role of Risk Management in Successful Project Management
    Obrova, Vladena
    Smolikova, Lenka
    VISION 2020: INNOVATION, DEVELOPMENT SUSTAINABILITY, AND ECONOMIC GROWTH, VOLS 1-3, 2013, : 1496 - 1503
  • [28] Risk management and value management in project appraisal
    Afila, D.
    Smith, N. J.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2007, 160 (02) : 63 - 67
  • [29] A Risk Management Methodology for Project Risk Dependencies
    Kwan, Tak Wah
    Leung, Hareton K. N.
    IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2011, 37 (05) : 635 - 648
  • [30] Risk identification step of the project risk management
    Kasap, Deniz
    Kaymak, Murat
    PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 2116 - 2120