Settlement control during the construction of urban tunnels by NATM construction of Kitayama Tunnel on national highway 455

被引:0
|
作者
Komatsu, Toshihiko
Kitamura, Hideyuki
Matsubara, Ken
Sakurai, Takaomi
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Kitayama Tunnel is constructed by the New Austrian Tunneling Method (NATM) through urban hills. The earth cover is thin throughout the tunnel alignment. It is necessary to control surface settlements according to the type of land use above the tunnel. The tunnel is stabilized by reinforcing the excavation face, tunnel crown and the foot of top heading, and giving priority to early closing of the ring. Ground stabilization ahead of the excavation face and the early reinforcement at the foot of top heading in particular were found to help control surface settlements.
引用
收藏
页码:1021 / 1026
页数:6
相关论文
共 50 条
  • [21] Additional Stress of Soil and Surface Settlement during Tunnel Shield Construction
    Li, Ying
    Bian, Xiaowei
    Peng, Hao
    Zhu, Baoqiang
    Zhou, Yilin
    BUILDINGS, 2023, 13 (06)
  • [22] Analysis of Ground Settlement during Shield Tunnel Construction in Soft Soil
    R. Huang
    J.-X. Zhu
    X.-J. Zhu
    Z.-M. Liu
    Soil Mechanics and Foundation Engineering, 2023, 60 : 134 - 140
  • [23] Ground settlement prediction during construction of Wuhan Yangtze River Tunnel
    Li, Guocheng
    Ding, Lieyun
    Wu, Xianguo
    Luo, Hanbin
    Li, Xiaoqing
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2007, 26 (SUPPL. 2): : 3631 - 3638
  • [24] Mutual influence of long-span urban highway tunnel and rail transit construction
    Yu, Honglin
    Liu, Shiyang
    Zheng, Chun
    Li, Yun
    Liu, Jie
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2022, 22 (01) : 41 - 55
  • [25] Safety control of urban tunnel construction crossing existing structures
    Hou, Yanjuan
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2016, 49 : 75 - 78
  • [26] Method of ground settlement and deformation prediction in urban tunnel construction with cross diaphragm method
    School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (2827-2833):
  • [27] Case Study on Tunnel Settlement Calculations during Construction Considering Shield Disturbance
    Fuxue Sun
    Zhouzhou Jin
    Chaoliang Wang
    Changfei Gou
    Xiaochun Li
    Cheng Liu
    Zheng Yu
    KSCE Journal of Civil Engineering, 2023, 27 : 2202 - 2216
  • [28] Case Study on Tunnel Settlement Calculations during Construction Considering Shield Disturbance
    Sun, Fuxue
    Jin, Zhouzhou
    Wang, Chaoliang
    Gou, Changfei
    Li, Xiaochun
    Liu, Cheng
    Yu, Zheng
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (05) : 2202 - 2216
  • [29] Relationship between the Intermediate Soil State and Settlement Control Measures during Tunnel Construction Undercrossing the Existing Station
    Wu, Shengzhi
    Zhang, Xueyu
    Li, Xiudong
    Chen, Jian
    Liang, Erbin
    Wu, Dun
    BUILDINGS, 2023, 13 (08)
  • [30] Experience gained in Madrid during the construction of tunnels crossing urban fills with TBM
    Melis, M
    Arnáiz, M
    Mendaña, F
    Reyes, RF
    Oteo, CS
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 2065 - 2071