Relationship between the Intermediate Soil State and Settlement Control Measures during Tunnel Construction Undercrossing the Existing Station

被引:1
|
作者
Wu, Shengzhi [1 ]
Zhang, Xueyu [1 ]
Li, Xiudong [2 ]
Chen, Jian [2 ]
Liang, Erbin [2 ]
Wu, Dun [2 ]
机构
[1] Shandong Jianzhu Univ, Sch Civil Engn, Key Lab Bldg Struct Retrofitting & Underground Spa, Jinan 250101, Peoples R China
[2] China Railway Fourteenth Bur Grp Co Ltd, Jinan 266000, Peoples R China
关键词
underpass construction; intermediate soil; existing station; settlement control; undercutting methods; GROUND SETTLEMENT; TWIN-TUNNELS; EXCAVATION; JACKING; MODEL;
D O I
10.3390/buildings13081933
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Settlement control of existing stations has consistently been a key issue in tunnel construction. Intermediate soil has a significant influence on the settlement of the existing station as a connector between the new tunnel and the existing station which should be considered when selecting settlement control measures. To clarify the relationship between the state of the intermediate soil and the settlement and control measures of the existing station, this study investigated 49 new tunnel projects under existing stations and elucidated the relationship between the settlement and the settlement control measures of the existing station and the intermediate soil. The relationship between the failure of the intermediate soil and the settlement of the existing station was further analyzed by numerical simulation. Lastly, a simple mechanical model of intermediate soil failure was constructed to determine the stress state of the intermediate soil in constructing a tunnel under the existing station to guide the formulation of settlement control measures for the existing station. Hence, when the intermediate soil is completely destroyed, active control measures, such as jack or grouting lifting, should be implemented; when the intermediate soil is partially damaged, passive control measures should be undertaken. Thus, this study can provide a reference for settlement control of tunnels under existing stations.
引用
收藏
页数:29
相关论文
共 30 条
  • [1] The influence of existing piles on station settlement during the construction of a tunnel undercrossing under existing stations
    Ma, Baolin
    Wu, Shengzhi
    Chen, Qihui
    Liang, Erbin
    Li, Xiudong
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [2] The Construction Methods and Control Mechanisms for Subway Station Undercrossing an Existing Tunnel at Zero Distance
    Zhou, Zihan
    Zhou, Xiaohan
    Li, Longping
    Liu, Xinrong
    Wang, Linfeng
    Wang, Ziqiang
    APPLIED SCIENCES-BASEL, 2023, 13 (15):
  • [3] Construction control of a newly-built subway station undercrossing the existing subway tunnel
    Zhang, Chengping
    Zhang, Dingli
    Wu, Jiepu
    Luo, Jianjun
    Zhongguo Tiedao Kexue/China Railway Science, 2009, 30 (01): : 69 - 73
  • [4] Analysis of Existing Tunnel Settlement Caused by Undercrossing Construction of Curved Metro Shield Tunnel
    Jiang J.
    Long Y.
    Ou X.
    Xing X.
    Zhang T.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2023, 55 (01): : 313 - 323
  • [5] Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
    Zhang Cheng-ping
    Zhang Ding-li
    Luo Jian-jun
    Wang Meng-shu
    Wu Jie-pu
    ROCK AND SOIL MECHANICS, 2009, 30 (06) : 1861 - 1866
  • [6] Effect of nearby undercrossing tunneling on the deformation of existing metro tunnel and construction control
    Zhang Qiong-fang
    Xia Tang-dai
    Ding Zhi
    Huang Xiao-bin
    Lin Cun-gang
    ROCK AND SOIL MECHANICS, 2016, 37 (12) : 3561 - 3568
  • [7] Effect of Vibration Caused by Blasting Construction of Undercrossing Tunnel on Comfort of Personnel in Existing Metro Station
    Sun B.
    Zhang D.
    Chen T.
    Fu H.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (02): : 81 - 87
  • [8] Frost heave control measures for the frozen double-line tunnel undercrossing an operation station
    Chen X.
    Ding H.
    Li F.
    Chen X.
    Gao W.
    Wang H.
    Wang L.
    Chen H.
    Meitan Xuebao/Journal of the China Coal Society, 2024, 49 (01): : 172 - 180
  • [9] Dynamic Prediction of Longitudinal Settlement of Existing Tunnel Using ConvRes-DLinear Model with Integration of Undercrossing Construction Process Information
    Nie, Cong
    Zhang, Dongming
    Ouyang, Linghan
    Huang, Xu
    Zhang, Bo
    Tong, Yue
    GEOSCIENCES, 2023, 13 (07)
  • [10] Study on Construction Control Measures of Shield Tunnel Overpassing Existing Tunnel in Sandy Silt
    Wang, Yahui
    Liu, Yan
    Liu, Junyan
    Zhang, Liangliang
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: TUNNELLING AND UNDERGROUND CONSTRUCTION, 2018, : 567 - 575