Identification of Causes of Non-excusable Delays of Construction Projects

被引:0
|
作者
Afshari, Hamidreza [1 ]
Khosravi, Shahrzad [1 ]
Ghorbanali, Abbas [1 ]
Borzabadi, Mandi [1 ]
Valipour, Mahbod [1 ]
机构
[1] Mapna Special Projects Construct & Dev Co MD 3, Planning & Informat Deputy, Tehran, Iran
来源
关键词
non-execuable delay; construction; subcontractor; performing organization;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
One of the key characteristics of the projects, especially construction projects. is executing the scope of work in a specific amount of time. As project time overrun may have bad consequences for the project performing organization such as cost overrun, damage of company's reputation, etc. it is important to clarify between causes of excusable delays and causes of non-excusable delays. Major purpose of this paper is to identify non-excusable delays of executive companies of Mapna Group in order to improve time performance of the project by managing better these causes. The scope of the research is the projects including thermal power plant, steam and power and utility projects which are completed or being executed by these affiliated companies. In this paper top 20 causes of non-excusable delay of construction projects have been identified by a Delphi questionnaire survey and applying Mean Rank method. To determine whether there is degree of agreement among the panel of experts with respect to their ranking of the causes of non-excusable construction delays, a test of hypothesis was developed and a significant degree of agreement among the expert was verified. "Not selecting competent subcontractors" was selected as the most important cause of none-excusable construction delays.
引用
收藏
页码:42 / 46
页数:5
相关论文
共 50 条
  • [1] Factors of non-excusable delays that influence contractors' performance
    Loughborough Univ, Looghborough, United Kingdom
    J Manage Eng, 3 (42-49):
  • [2] Factors of non-excusable delays that influence contractors' performance
    Majid, MZA
    McCaffer, R
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (03) : 42 - 49
  • [3] Non Excusable Delays in Construction Industry: A Causal Study
    Khahro, Shabir Hussain
    Memon, Zubair Ahmed
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (06) : 3561 - 3564
  • [4] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [5] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [6] CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY
    Kazaz, Aynur
    Ulubeyli, Serdar
    Tuncbilekli, Nihan Avcioglu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (03) : 426 - 435
  • [7] Construction projects: interactions of the causes of delays
    Purushothaman, Mahesh Babu
    San Pedro, Leo Neil Resurreccion
    GhaffarianHoseini, Ali
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [8] Causes of Construction Projects Delays: A qualitative analysis
    Rudeli, N.
    Viles, E.
    Gonzalez, J.
    Santilli, A.
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2018, (16): : 71 - 84
  • [9] Causes of delays on construction projects: a comprehensive list
    Durdyev, Serdar
    Hosseini, M. Reza
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 20 - 46
  • [10] Causes of schedule delays in construction projects in Algeria
    Rachid, Zemra
    Toufik, Boudouh
    Mohammed, Baheddi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 371 - 381