Causes of schedule delays in construction projects in Algeria

被引:58
|
作者
Rachid, Zemra [1 ]
Toufik, Boudouh [2 ]
Mohammed, Baheddi [1 ]
机构
[1] Univ Batna 2, Dept Civil Engn, Batna, Algeria
[2] Univ Bourgogne Franche Comte, UTBM, CNRS, ICB UMR 6303, Belfort, France
关键词
Construction projects; Algeria; risk management; delay causes; relative importance index;
D O I
10.1080/15623599.2018.1435234
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is a major sector in the economy of developing countries. During the last two decades in Algeria, many large-scale construction projects have been launched to develop the basic infrastructure facilities of the country. However, most of these projects experience extensive delays. The objective of this paper is to identify the causes of delay in the Algerian construction industry and assess their importance according to the main project stakeholders, which are the owner, the contractor and the consultant. Data were collected through a questionnaire and direct interviews of a sample of construction experts including 16 owners, 16 contractors and 20 consultants. Fifty-nine causes of delay were identified in this research. The results indicate that the five most important causes are slow change orders, unrealistic contract duration, slow variation orders in extra quantities, delays in payment of performed work and ineffective planning and scheduling by contractors. The study revealed that owner-related causes are the most important sources of delay. The findings of this research can be used to guide the improvements of the construction industry in Algeria.
引用
收藏
页码:371 / 381
页数:11
相关论文
共 50 条
  • [1] Identifying and Ranking the Root Causes of Schedule Delays in Oil and Gas Pipeline Construction Projects
    Alshibani, Adel
    Julaih, Mohammed
    Adress, Ahamd
    Alshamrani, Othman
    Almaziad, Faris
    ENERGIES, 2023, 16 (01)
  • [2] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [3] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [4] CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY
    Kazaz, Aynur
    Ulubeyli, Serdar
    Tuncbilekli, Nihan Avcioglu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (03) : 426 - 435
  • [5] Construction projects: interactions of the causes of delays
    Purushothaman, Mahesh Babu
    San Pedro, Leo Neil Resurreccion
    GhaffarianHoseini, Ali
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [6] Causes of Construction Projects Delays: A qualitative analysis
    Rudeli, N.
    Viles, E.
    Gonzalez, J.
    Santilli, A.
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2018, (16): : 71 - 84
  • [7] Causes of delays on construction projects: a comprehensive list
    Durdyev, Serdar
    Hosseini, M. Reza
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 20 - 46
  • [8] Cost escalation and schedule delays in road construction projects in Zambia
    Kaliba, Chabota
    Muya, Mundia
    Mumba, Kanyuka
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) : 522 - 531
  • [9] Causes of delays in road construction projects: a systematic review
    Kumar, Modish
    Kumari, Santosh
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2025,
  • [10] Causes of delays in the construction phase of Chinese building projects
    Wang, Ting-Kwei
    Ford, David N.
    Chong, Heap-Yih
    Zhang, Wei
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (11) : 1534 - 1551