Factors of non-excusable delays that influence contractors' performance

被引:0
|
作者
Loughborough Univ, Looghborough, United Kingdom [1 ]
机构
来源
J Manage Eng | / 3卷 / 42-49期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Factors of non-excusable delays that influence contractors' performance
    Majid, MZA
    McCaffer, R
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (03) : 42 - 49
  • [2] Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria
    Ibironke, Olajide Timothy
    Oladinrin, Timo Olugbenga
    Adeniyi, Onaopepo
    Eboreime, Idowu Victor
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (01) : 53 - 72
  • [3] Identification of Causes of Non-excusable Delays of Construction Projects
    Afshari, Hamidreza
    Khosravi, Shahrzad
    Ghorbanali, Abbas
    Borzabadi, Mandi
    Valipour, Mahbod
    E-BUSINESS, MANAGEMENT AND ECONOMICS, 2011, 3 : 42 - 46
  • [4] Non Excusable Delays in Construction Industry: A Causal Study
    Khahro, Shabir Hussain
    Memon, Zubair Ahmed
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (06) : 3561 - 3564
  • [5] Factors that influence safety performance of specialty contractors
    Hinze, J
    Gambatese, J
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02): : 159 - 164
  • [6] Factors effecting construction contractors' performance
    Assaf, SA
    AlHammad, AM
    Ubaid, A
    BUILDING RESEARCH AND INFORMATION, 1996, 24 (03): : 159 - 163
  • [7] Factors affecting US contractors' performance overseas
    Arditi, David
    Gutierrez, Arturo E.
    Journal of Construction Engineering and Management, 1991, 117 (01) : 27 - 46
  • [8] Significant Factors of Construction Delays Among Contractors in Klang Valley and its Mitigation
    Hasmori, Muhammad Fikri
    Said, Ilias
    Deraman, Rafikullah
    Abas, Nor Haslinda
    Nagapan, Sasitharan
    Ismail, Mohd Hanif
    Khalid, Faisal Sheikh
    Roslan, Ahmad Farhan
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2018, 10 (02): : 32 - 36
  • [9] Factors affecting the safety performance of contractors and construction sites
    Wong, KW
    Chan, PC
    Lo, KK
    IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1999, : 19 - 24
  • [10] The influence of publication delays on impact factors
    Yu, G
    Wang, XH
    Yu, DR
    SCIENTOMETRICS, 2005, 64 (02) : 235 - 246