Investing in suppliers with capacity constraints in a decentralized assembly system

被引:14
|
作者
Fu, Hong [1 ,2 ]
Li, Kai [1 ,2 ]
Fu, Weizhong [1 ,2 ]
机构
[1] Hefei Univ Technol, Sch Management, Hefei 230009, Anhui, Peoples R China
[2] Minist Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei 230009, Anhui, Peoples R China
基金
中国国家自然科学基金;
关键词
Assembly system; Capacity investment; Supplier development; Uncertain demand; Stackelberg game; PRODUCTION DECISIONS; RANDOM YIELD; CHAIN; COORDINATION; COMPETITION; INVESTMENT; QUALITY; PULL; PUSH; CONTRACTS;
D O I
10.1016/j.cie.2020.106332
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study investigates a decentralized assembly system, in which a single downstream assembler buys complementary components from multiple upstream suppliers, and then assembles them into a final product to satisfy an uncertain market demand. Suppliers have capacity constraints, and the assembler considers to invest in suppliers to increase their capacities. The investment problem of the assembler is a complex multi-dimensional optimization problem. We first characterize the optimal pricing and production decisions of all supply chain members assuming that the investment strategy is given. We then derive optimal investment strategy for the assembler. We show that the assembler's optimal total investment increases in the retail price, and decreases in both the component production cost and the assembly cost, but is nonmonotonically related to the component capacity expansion cost. We also show that the performance of the entire supply chain highly depends on the allocation of the total component cost between the capacity expansion and production activities.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] The impact of hybrid push-pull contract in a decentralized assembly system
    Guan, Xu
    Ma, Shihua
    Yin, Zhe
    Omega (United Kingdom), 2015, 50 : 70 - 81
  • [42] The implication of time-based payment contract in the decentralized assembly system
    Xu Guan
    Guo Li
    Zhe Yin
    Annals of Operations Research, 2016, 240 : 641 - 659
  • [43] Procurement auctions with capacity constrained suppliers
    Chaturvedi, Aadhaar
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 247 (03) : 987 - 995
  • [44] Impact of decision sequence of pricing and quality investment in decentralized assembly system
    Yu, Jianhong
    Ma, Shihua
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (04) : 664 - 679
  • [45] The impact of hybrid push-pull contract in a decentralized assembly system
    Guan, Xu
    Ma, Shihua
    Yin, Zhe
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 50 : 70 - 81
  • [46] Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system
    Golmohammadi, Amirmohsen
    Tajbakhsh, Alireza
    Dia, Mohamed
    Takouda, Pawoumodom M.
    ANNALS OF OPERATIONS RESEARCH, 2022, 312 (01) : 159 - 192
  • [47] Should suppliers allow capacity transfers?
    Khanjari, Neda
    Duenyas, Izak
    Iravani, Seyed M. R.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2022, 31 (05) : 2324 - 2340
  • [48] Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system
    Amirmohsen Golmohammadi
    Alireza Tajbakhsh
    Mohamed Dia
    Pawoumodom M. Takouda
    Annals of Operations Research, 2022, 312 : 159 - 192
  • [49] The impact of hybrid push-pull contract in a decentralized assembly system
    Guan, Xu
    Ma, Shihua
    Yin, Zhe
    Omega (United Kingdom), 2015, 50 : 70 - 81
  • [50] Filipino suppliers add polyolefins capacity
    不详
    MODERN PLASTICS, 1998, 75 (01): : 20 - 20