共 50 条
- [1] Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system Annals of Operations Research, 2022, 312 : 159 - 192
- [2] Decentralized Robotic Assembly with Physical Ordering and Timing Constraints 2013 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS (IROS), 2013, : 5764 - 5771
- [4] Utilizing clock skew for timing reliability improvement TENCON 2007 - 2007 IEEE REGION 10 CONFERENCE, VOLS 1-3, 2007, : 1351 - +
- [8] Diversity of payment contracts in a decentralized assembly system Annals of Operations Research, 2017, 257 : 613 - 639
- [9] Improvement on the new ordering constraints evaluation algorithm of product reliability Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2015, 37 (02): : 468 - 472
- [10] TIMING OF BORROWING DECISIONS - A DECISION SUPPORT SYSTEM JOURNAL OF SYSTEMS MANAGEMENT, 1983, 34 (04): : 6 - 9