Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system

被引:7
|
作者
Golmohammadi, Amirmohsen [1 ]
Tajbakhsh, Alireza [2 ]
Dia, Mohamed [1 ]
Takouda, Pawoumodom M. [1 ]
机构
[1] Laurentian Univ, Fac Management, Dept Finance & Operat, 935 Ramsey Lake Rd, Ramsey, ON P3E 2C6, Canada
[2] Univ Lethbridge, Fac Management, Dept Strategy & Policy, 4401 Univ Dr, Lethbridge, AB T1K 3M4, Canada
关键词
Supply chain management; Reliability improvement; Supply uncertainty; Assembly system; Investment; CHAIN RISK-MANAGEMENT; SUPPLY-CHAIN; LEAD-TIME; COMPETING SUPPLIERS; CAPACITY INVESTMENT; COOPERATION; CONTRACTS; DEMAND; PULL; PUSH;
D O I
10.1007/s10479-019-03399-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, we investigate a decentralized assembly system in which the suppliers are unreliable and have uncertain production capacities. We focus on the case in which a manufacturer deals with two suppliers that provide complementary products. We assume that the suppliers have the opportunity to improve their reliabilities through investments. The manufacturer determines her order quantities and the suppliers decide on their investment amounts in their capacities. The timing of the decisions has a substantial effect on the optimal behaviors of the players. We investigate the problem under four different settings based on the sequence of events: (1) simultaneous ordering and investment in which decisions are made concurrently, (2) ordering after observation of capacities in which the manufacturer orders after observing the suppliers' capacities, (3) ordering before realization of capacities in which the manufacturer orders after the suppliers' investment decisions, and (4) ordering before investments in which the suppliers invest after the manufacturer's ordering decision. We demonstrate the existence of a Pareto optimal equilibrium in the first two scenarios. In addition, we show that in the fourth scenario, there exists a unique Nash equilibrium in the suppliers' game. Based on the realized capacities of the suppliers, it may be beneficial for them to share their production information with the manufacturer. In addition, we indicate that using a sequential decision strategy can enhance the performances of the supply chain and the members. When the suppliers are the leaders, they implement investment inflation strategies to stimulate the manufacturer to place larger orders. When the manufacturer is the leader, she uses an order inflation strategy to increase the investment of the suppliers. Our numerical analysis revealed that in different situations, the players may prefer ordering before realization of capacities scenario or ordering before investments. Finally, we extended our results to a multiple-suppliers case in which the suppliers are identical.
引用
收藏
页码:159 / 192
页数:34
相关论文
共 50 条
  • [11] IMPROVEMENT OF TELECOMMUNICATIONS SYSTEM RELIABILITY
    ASAMURA, I
    SUGISAKA, Y
    JAPAN TELECOMMUNICATIONS REVIEW, 1974, 16 (01): : 3 - 10
  • [12] Improvement of Timing Reliability and Data Transfer Security of Synchrophasor Measurements
    Zhan, L.
    Zhou, D.
    King, T.
    Liu, Y.
    Johannessen, E.
    Alexander, J.
    Boza, B.
    2014 IEEE PES T&D CONFERENCE AND EXPOSITION, 2014,
  • [13] Investing in suppliers with capacity constraints in a decentralized assembly system
    Fu, Hong
    Li, Kai
    Fu, Weizhong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 142
  • [14] OPERATIONAL DECISION FOR A SUPPLY CHAIN IN A DECENTRALIZED ASSEMBLY SYSTEM
    Qin, Zhaoqiong
    TRANSPORTATION SYSTEMS: ENGINEERING & MANAGEMENT, 2007, : 373 - 381
  • [15] Coordination in the Decentralized Assembly System with Dual Supply Modes
    Guan, Xu
    Liu, Mengqi
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2013, 2013
  • [16] Quality investment in a decentralized assembly system with backward shareholding
    Xiao, Wei
    Li, Kai
    Fu, Hong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 242
  • [17] System in Package (SiP) Assembly and Reliability
    Ghaffarian, Reza
    PROCEEDINGS OF THE 2019 EIGHTEENTH IEEE INTERSOCIETY CONFERENCE ON THERMAL AND THERMOMECHANICAL PHENOMENA IN ELECTRONIC SYSTEMS (ITHERM 2019), 2019, : 477 - 484
  • [18] Critical spare parts ordering decisions using conditional reliability and stochastic lead time
    Godoy, David R.
    Pascual, Rodrigo
    Knights, Peter
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 119 : 199 - 206
  • [19] Optimal demand rate, lot sizing, and process reliability improvement decisions
    Lee, WJ
    Kim, D
    Cabot, AV
    IIE TRANSACTIONS, 1996, 28 (11) : 941 - 952
  • [20] On the limitations of redundancies in the improvement of system reliability
    Paté-Cornell, ME
    Dillon, RL
    Guikema, SD
    RISK ANALYSIS, 2004, 24 (06) : 1423 - 1436