A fuzzy approach for the earned value management

被引:64
|
作者
Naeni, Leila Moslemi [2 ]
Shadrokh, Shahram [2 ]
Salehipour, Amir [1 ]
机构
[1] Tarbiat Modares Univ, Sch Engn, Dept Ind Engn, Tehran, Iran
[2] Sharif Univ Tech, Dept Ind Engn, Tehran, Iran
关键词
Fuzzy earned value; Earned value technique; Uncertainty; Project progress;
D O I
10.1016/j.ijproman.2010.07.012
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The earned value technique is a crucial technique in analyzing and controlling the performance of a project which allows a more accurate measurement of both the performance and the progress of a project. This paper presents a new fuzzy-based earned value model with the advantage of developing and analyzing the earned value indices, and the time and the cost estimates at completion under uncertainty. As the uncertainty is inherent in real-life activities, the developed model is very useful in evaluating the progress of a project where uncertainty arises. A small example illustrates how the new model can be implemented in reality. (c) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:764 / 772
页数:9
相关论文
共 50 条
  • [41] Earned value management at NASA: An integrated, lightweight solution
    Putz, Peter
    Maluf, David A.
    Bell, David G.
    Gurram, Mohana M.
    Hsu, Jennifer
    Patel, Hemil N.
    Swanson, Keith J.
    2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 4655 - +
  • [42] Earned value project management: Improving the predictive power of planned value
    Chen, Hong Long
    Chen, Wei Tong
    Lin, Ying Lien
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 22 - 29
  • [43] A Systematic Review Based on Earned Value Management and Quality
    Lima Francisco, Christopher de Souza
    de Souza, Adler Diniz
    16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 135 - 141
  • [44] Combination of Project Cost Forecasts in Earned Value Management
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 958 - 966
  • [45] Earned Value Management System in Indonesian Construction Projects
    Priyo, Mandiyo
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 37 - 45
  • [46] Use of Earned Value Management in the UAE Construction Industry
    Morad, Mohamed
    El-Sayegh, Sameh M.
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [47] Earned value management insights using inferential statistics
    Marshall, Robert A.
    Ruiz, Philippe
    Bredillet, Christophe N.
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (02) : 288 - 294
  • [48] Measuring the Actual Energy Cost Performance of Green Buildings: A Test of the Earned Value Management Approach
    Dwaikat, Luay N.
    Ali, Kherun N.
    ENERGIES, 2016, 9 (03):
  • [49] The Application of Improved Earned Value Management Method in Engineering Project Management
    Gao Xiuju
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 383 - 387
  • [50] The research on optimization of earned value management method in engineering budget management
    School of Business and Administration, North China Electric Power University, Beijing, China
    不详
    Open Civ. Eng. J., 1 (369-375):