A fuzzy approach for the earned value management

被引:64
|
作者
Naeni, Leila Moslemi [2 ]
Shadrokh, Shahram [2 ]
Salehipour, Amir [1 ]
机构
[1] Tarbiat Modares Univ, Sch Engn, Dept Ind Engn, Tehran, Iran
[2] Sharif Univ Tech, Dept Ind Engn, Tehran, Iran
关键词
Fuzzy earned value; Earned value technique; Uncertainty; Project progress;
D O I
10.1016/j.ijproman.2010.07.012
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The earned value technique is a crucial technique in analyzing and controlling the performance of a project which allows a more accurate measurement of both the performance and the progress of a project. This paper presents a new fuzzy-based earned value model with the advantage of developing and analyzing the earned value indices, and the time and the cost estimates at completion under uncertainty. As the uncertainty is inherent in real-life activities, the developed model is very useful in evaluating the progress of a project where uncertainty arises. A small example illustrates how the new model can be implemented in reality. (c) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:764 / 772
页数:9
相关论文
共 50 条
  • [11] A Bayesian Approach to Improve Estimate at Completion in Earned Value Management
    Caron, Franco
    Ruggeri, Fabrizio
    Merli, Alessandro
    PROJECT MANAGEMENT JOURNAL, 2013, 44 (01) : 3 - 16
  • [12] Project management: Earned value management
    Duncan, B
    TECHNOLOGY OF OBJECT-ORIENTED LANGUAGES AND SYSTEMS - TOOLS 34, PROCEEDINGS, 2000, : 513 - 514
  • [13] Earned schedule: An emerging enhancement to earned value management
    Lipke, Walt
    Henderson, Kym
    CrossTalk, 2006, 19 (11): : 26 - 30
  • [14] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [15] Modernizing earned value management
    Abba, Wayne F. (abbaconsulting@cox.net), 1600, U.S. Department of Defense (30):
  • [16] A New Approach to Z-number Based Earned Value Management
    Kuchta, Dorota
    Zabor, Adam
    FUZZY INFORMATION AND ENGINEERING, 2022, 14 (04) : 361 - 378
  • [17] A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach
    Salari, Mostafa
    Bagherpour, Morteza
    Reihani, Mohammad Hossein
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (04) : 1909 - 1919
  • [18] Quantified Benefits of Earned Value Management
    Jones, Matthew Evans
    2023 IEEE AEROSPACE CONFERENCE, 2023,
  • [19] Earned-value management terminology
    Heires, JT
    COMPUTER, 2003, 36 (08) : 5 - 5
  • [20] Earned value management clogs profits
    Gupta, Sanjeev
    Ind Manage (Norcross GA), 2008, 3 (12-16): : 12 - 16