A fuzzy approach for the earned value management

被引:64
|
作者
Naeni, Leila Moslemi [2 ]
Shadrokh, Shahram [2 ]
Salehipour, Amir [1 ]
机构
[1] Tarbiat Modares Univ, Sch Engn, Dept Ind Engn, Tehran, Iran
[2] Sharif Univ Tech, Dept Ind Engn, Tehran, Iran
关键词
Fuzzy earned value; Earned value technique; Uncertainty; Project progress;
D O I
10.1016/j.ijproman.2010.07.012
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The earned value technique is a crucial technique in analyzing and controlling the performance of a project which allows a more accurate measurement of both the performance and the progress of a project. This paper presents a new fuzzy-based earned value model with the advantage of developing and analyzing the earned value indices, and the time and the cost estimates at completion under uncertainty. As the uncertainty is inherent in real-life activities, the developed model is very useful in evaluating the progress of a project where uncertainty arises. A small example illustrates how the new model can be implemented in reality. (c) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:764 / 772
页数:9
相关论文
共 50 条
  • [21] The Application of Earned Value in Project Management
    Lv, Xiuling
    Wu, Jiangfeng
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2844 - 2847
  • [22] Earned Value Management Software Projects
    Hanna, Robert A.
    SMC-IT 2009: THIRD IEEE INTERNATIONAL CONFERENCE ON SPACE MISSION CHALLENGES FOR INFORMATION TECHNOLOGY, PROCEEDINGS, 2009, : 297 - 304
  • [23] Earned Value Management Symposium a Success
    Fontaine, Dan
    Insight, 2000, 2 (04)
  • [24] Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management
    Miguel, Angelimarie
    Madria, Wira
    Polancos, Ronaldo
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 622 - 628
  • [25] An Active Construction Dynamic Schedule Management Model: Using the Fuzzy Earned Value Management and BP Neural Network
    Yu, Fangfang
    Chen, Xiaobo
    Cory, Clark A.
    Yang, Zhixuan
    Hu, Yingwen
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (07) : 2335 - 2349
  • [26] An Active Construction Dynamic Schedule Management Model: Using the Fuzzy Earned Value Management and BP Neural Network
    Fangfang Yu
    Xiaobo Chen
    Clark A. Cory
    Zhixuan Yang
    Yingwen Hu
    KSCE Journal of Civil Engineering, 2021, 25 : 2335 - 2349
  • [27] Quality: the third element of earned value management
    Dodson, Marcelo
    Defavari, Guilherme
    de Carvalho, Vitor
    CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2015, 2015, 64 : 932 - 939
  • [28] Earned value management in project time control
    Vakhrushkina A.V.
    Mishakova A.V.
    Borshcheva K.D.
    Magazine of Civil Engineering, 2017, 71 (03): : 30 - 38
  • [29] INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT
    Bagherpour, Morteza
    Khaje Zadeh, Mohammad
    Mahmoudi, Amin
    Deng, Xiaopeng
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (06) : 524 - 533
  • [30] Earned value management in a data warehouse project
    Department of Information Technology, College of Information Technology, Georgia Southern University, Statesboro, GA, United States
    不详
    不详
    Inf Manage Comput Secur, 2006, 1 (37-50):