Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation

被引:0
|
作者
Cao, Pengliang [1 ]
Zhao, Hongran [1 ]
Jiang, Guiyan [2 ]
机构
[1] Ningbo Univ, Fac Maritime & Transportat, Ningbo, Zhejiang, Peoples R China
[2] Ningbo Univ, Jiangsu Prov Collaborat Innovat Ctr Modern Urban, Natl Traff Management Engn & Technol, Res Ctr Ningbo Univ Subctr,Fac Maritime & Transp, Ningbo, Zhejiang, Peoples R China
关键词
Container terminal; Loading operation; Yard Crane; Yard Truck; Integrated scheduling; GENETIC ALGORITHM;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
To further decrease berthing time of container vessels, synchronous operation of Yard Cranes (YCs) and Yard Trucks (YTs) is mainly considered in multiple work lines condition. On this basis, an integrated scheduling optimization model of YC and YT, aiming at minimize the makespan of loading operation, is provided based on YT pool strategy with the consideration of practical constrains, such as the safe distance between YCs, task precedence and so on. Considering the complexity of mathematical model, the Genetic Algorithm (GA) is introduced to allocate workload for YCs, a routing method is used to find the shortest travelling paths for YCs and the First Come First Serve (FCFS) rule is adopted to schedule YTs among different work lines dynamically. In the end, the effectiveness of optimization model and algorithm is certified by making numerical experiments. The results show that using pool strategy is beneficial to short makespan of loading operation when YTs are relatively less.
引用
收藏
页码:595 / 599
页数:5
相关论文
共 50 条
  • [21] An exact method for scheduling a yard crane
    Gharehgozli, Amir Hossein
    Yu, Yugang
    de Koster, Rene
    Udding, Jan Tijmen
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (02) : 431 - 447
  • [22] Integrated Optimization on Double-Side Cantilever Yard Crane Scheduling and Green Vehicle Path Planning at U-Shaped Yard
    Peng, Wenhao
    Wang, Dujuan
    Qiu, Huaxin
    Chu, Feng
    Yin, Yunqiang
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2025, 26 (03) : 3684 - 3699
  • [23] Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time
    Wang, Xu
    Zhao, Qiuhong
    Liu, Shixin
    Wang, Jia
    Qi, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (05) : 1707 - 1724
  • [24] Optimization of Quotas and Yard Crane Allocation in Pick-up Truck Appointment
    Li N.
    Bian Z.
    Xu Q.
    Jin Z.-H.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2019, 19 (06): : 206 - 214and222
  • [25] Integrated Bay Allocation and Yard Crane Scheduling Problem for Transshipment Containers
    Lee, Der-Horng
    Jin, Jian Gang
    Chen, Jiang Hang
    TRANSPORTATION RESEARCH RECORD, 2011, (2222) : 63 - 71
  • [26] Quay crane and yard truck dual-cycle scheduling with mixed storage strategy
    Zhu, Shengyan
    Tan, Zheyi
    Yang, Zhiyuan
    Cai, Lecai
    ADVANCED ENGINEERING INFORMATICS, 2022, 54
  • [27] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470
  • [28] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [29] A Crane Guidance System with Scheduling Optimization Technology in a Steel Slab Yard
    Kuyama, Shuji
    Tomiyama, Shinji
    ISIJ INTERNATIONAL, 2016, 56 (05) : 820 - 827
  • [30] Truck Loading Schedule Optimization Using Genetic Algorithm for Yard Management
    Cekala, Tadeusz
    Telec, Zbigniew
    Trawinski, Bogdan
    INTELLIGENT INFORMATION AND DATABASE SYSTEMS, PT I, 2015, 9011 : 536 - 548